Laserfiche WebLink
Bowie No. 2 Mine C1996083 Technical Revision No. 86 <br />Page 3 of 9 <br />Drill Rig Time (12 <br />ATLAS COPCO ROC <br />NA <br />NA <br />156.00 <br />EA <br />$165.79 <br />$25,863.24 <br />hrs ea 13 holes ) <br />D7- 11,4.0 in. <br />Water Truck Time <br />Water Tanker, 2,500 Gal. <br />NA <br />NA <br />156.00 <br />EA <br />$50.75 <br />$7,917.00 <br />(12 hrs ea 13 <br />holes <br />PVC Plugs <br />PVC plug - 10 in. <br />9.375 <br />NA <br />13.00 <br />EA <br />$96.54 <br />$1,255.02 <br />diameter borehole <br />Hole Markers <br />Borehole <br />NA <br />NA <br />13.00 <br />EA <br />$2.81 <br />$36.53 <br />location/identification <br />marker (EA, material <br />cost only) <br />Exposed Casing <br />Exposed casing removal <br />9.375 <br />3 <br />39.00 <br />LF <br />$5.87 <br />$228.93 <br />Removal <br />- 4 to 10 in. diameter <br />steel pipe (L F) <br />Job Hours: 156 Total Cost: $119,069.97 <br />CIRCES Cost Estimating Software <br />