Laserfiche WebLink
COST SUMMARY WORK <br />Task description: MR -148 net after concrete sub. for <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />Task #: OOG <br />Date: 3/12/2014 <br />User: SLB <br />Permit Action: Minor Revision <br />148 Permit/Job #: C1996083 <br />State: Colorado <br />County: Delta <br />Agency or organization name <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Abbreviation: None <br />Filename: C083 -OOG <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />355 <br />356 <br />Remove concrete patch on haul road <br />DEMOLISH <br />1 <br />1 <br />0.00 <br />$1,932.56 <br />($772.59) <br />Credit for pavement removal <br />NA <br />0.00 <br />SUBTOTALS: <br />0 <br />$1,159.97 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and/or contract/bid preparation: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />$23.43 <br />$12.18 <br />$0.00 <br />$116.00 <br />$151.61 <br />$1,311.58 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />4.00% <br />Total = $52.46 <br />Reclamation management and /or administration: <br />3.13% <br />$41.05 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $245.13 <br />TOTAL BOND AMOUNT (direct + indirect) = $1,405.10 <br />