Laserfiche WebLink
5/6/2014 State.co.us Executive Branch Mail - Fwd: Recent mailings and Comments <br />b) to deliver 6 1/2 ft of water would probably take 7 -8 ft of water at the point of insertion <br />c) a minimum of 3 ft culvert to carry 8 ft of water, maybe larger to account for trash passing through <br />d) one would need multiple monitors, perhaps as many as one per panel to identify a loss of 1 -2 ft in this steep <br />rocky canyon <br />e) There are no roads to haul in culvert. Helicopter would have to fight a canopy of Spruce, so access problem <br />f) the creek bed itself is nothing but large boulders, so installation would have to be terraced. <br />g) and supported how? <br />TDRC does not see any practical way to augment water in West Terror Creek in a timely fashion. At a minimum <br />installing culverts of this size in this canyon would take way too long, a week or more to prevent substantial injury <br />to our water users. <br />Thank -you for your consideration in this matter, <br />Terror Ditch and Reservoir Co. <br />https: / /mail.g oog le.conVmai I /u /0 / ?ui =2 &i Ire29129fcb5 &view= pt &search =i nbox&th =145d 1 ef9a3c65e24 &si ml =145dl ef9a3c65e24 2/2 <br />