My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-02_REPORT - M1974004
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1974004
>
2014-05-02_REPORT - M1974004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:44 PM
Creation date
5/6/2014 9:48:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974004
IBM Index Class Name
REPORT
Doc Date
5/2/2014
Doc Name
Stability analysis of spec agg quarry
From
Martin Marietta Materials
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Martin Marietta Materials <br />Spec -Agg 2014 Annual Report <br />2.0 PURPOSE AND SCOPE OF WORK <br />The purpose of the annual evaluation is to monitor the influence the bedrock structural geology has on pit <br />wall stability as mining progresses. The data collected during this annual assessment was obtained <br />during two site visits. <br />The scope of this study is as follows: <br />• Observe recent rock mass exposures for large -scale instability and collect geologic rock structure <br />data. <br />• Document the orientation and character of rock mass discontinuities (e.g., joints, foliation and faults) <br />where recent exposures are accessible to supplement the existing structural geology database. <br />• Document groundwater observations at mapped locations. <br />• Photograph significant findings at the mapped rock mass exposures. <br />• Compare the new rock structure data collected during the 2013 -2014 annual study with the previously <br />collected data to identify potential changes to the previously analyzed discontinuity sets and possible <br />new sets that may need to be considered for the mine highwall slope stability analysis. <br />• Update the rock slope stability analyses for the final mine highwall slopes based on the new rock <br />structure data. <br />• Prepare this report to summarize the field observations, mapping data and slope stability analyses <br />results. <br />March 31, 2014 Page 2 Lachel & Associates, Inc. <br />Project 13364013.00 02014 All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.