Laserfiche WebLink
Bowie No. 2 Mine C1996083 Technical Revision No.77 Page 19 of 34 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />750.00 <br />5.00 <br />5.00 <br />10.00 <br />1068 <br />0.716 <br />Haul Time: 0.716 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />750.00 <br />-5.00 <br />5.00 <br />0.00 <br />2938 <br />0.280 <br />Return Time: 0.280 <br />Total Truck Cycle Time: 3.576 <br />Loading Tool unit <br />Production 391.61 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />183.98 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks <br />2 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 152.70 <br />Adjusted single truck/loader team production: 152.70 <br />Adjusted multiple truck/loader team production: 152.70 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.173 /LCY <br />minutes <br />minutes <br />325.03 LCY/Hour <br />152.70 LCY/Hour <br />1 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 228.88 Hours <br />Total job cost: $40,983.15 <br />CIRCES Cost Estimating Software <br />