My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-05_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-05-05_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:46 PM
Creation date
5/6/2014 9:33:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
5/5/2014
Doc Name
Reclamation Cost Estimate (Revised)
From
DRMS
To
Tamme Bishop
Type & Sequence
TR77
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Technical Revision No.77 Page 11 of 34 <br />Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />2000.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.810 <br />2 <br />4000.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />1.416 <br />3 <br />1000.00 <br />10.00 <br />3.00 <br />13.00 <br />834 <br />0.191 <br />Haul Time <br />Return Route: <br />2.417 <br />minutes <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 <br />1000.00 <br />-10.00 <br />3.00 <br />-7.00 <br />2938 <br />0.410 <br />2 <br />4000.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />1.392 <br />3 <br />2000.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.696 <br />Loading Tool unit <br />Production 437.36 <br />Truck Unit Production <br />87.77 <br />Optimal No. of Trucks: 5 <br />Return Time: 2.498 <br />Total Truck Cycle Time: 7.275 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 291.41 <br />Adjusted single truck/loader team production: 291.41 <br />Adjusted multiple truck/loader team production: 291.41 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.389 /LCY <br />minutes <br />minutes <br />363.01 LCY/Hour <br />72.85 LCY/Hour <br />4 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 235.64 Hours <br />Total job cost: $95,377.30 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.