Laserfiche WebLink
Bowie No. 2 Mine C1996083 Technical Revision No.77 Page 11 of 34 <br />Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />2000.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.810 <br />2 <br />4000.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />1.416 <br />3 <br />1000.00 <br />10.00 <br />3.00 <br />13.00 <br />834 <br />0.191 <br />Haul Time <br />Return Route: <br />2.417 <br />minutes <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 <br />1000.00 <br />-10.00 <br />3.00 <br />-7.00 <br />2938 <br />0.410 <br />2 <br />4000.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />1.392 <br />3 <br />2000.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.696 <br />Loading Tool unit <br />Production 437.36 <br />Truck Unit Production <br />87.77 <br />Optimal No. of Trucks: 5 <br />Return Time: 2.498 <br />Total Truck Cycle Time: 7.275 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 291.41 <br />Adjusted single truck/loader team production: 291.41 <br />Adjusted multiple truck/loader team production: 291.41 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.389 /LCY <br />minutes <br />minutes <br />363.01 LCY/Hour <br />72.85 LCY/Hour <br />4 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 235.64 Hours <br />Total job cost: $95,377.30 <br />CIRCES Cost Estimating Software <br />