My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-05_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-05-05_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:46 PM
Creation date
5/6/2014 9:33:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
5/5/2014
Doc Name
Reclamation Cost Estimate (Revised)
From
DRMS
To
Tamme Bishop
Type & Sequence
TR77
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Technical Revision No.77 Page 9 of 34 <br />Task description: <br />Site: Bowie No. 2 Mine <br />TRUCK/LOADER TEAM WORK <br />Haul Cover Material from Gob Pile #3 to Gob Pile #2 <br />PROJECT IDENTIFICATION <br />Permit Action: Technical Revision 77 Permit /Job #: C1996083 <br />Task #: 045 State: Colorado <br />Date: 4/29/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team - Truck: Generic 10 -12 cy, 6x4 <br />- Loader: CAT 950H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C083 -045 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $404.75 <br />MATERIAL OUANTITIES <br />Initial volume: 58,943 CCY Swell factor: 1.165 <br />Loose volume: 68,669 LCY <br />Source of estimated volume: Volume IX, Appendix A <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pavload (weight) Basis: <br />Material weight: 2,900 <br />Description: Decom <br />Rated Payload: 35,400 <br />Payload Capacity: 12.21 <br />Pounds/LCY <br />rock - 50% Rock, 50% Earth <br />Pounds <br />LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.02 <br />$24.98 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$63.21 <br />$43.03 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$35.82 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$75.23 <br />$103.83 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $404.75 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $404.75 <br />MATERIAL OUANTITIES <br />Initial volume: 58,943 CCY Swell factor: 1.165 <br />Loose volume: 68,669 LCY <br />Source of estimated volume: Volume IX, Appendix A <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pavload (weight) Basis: <br />Material weight: 2,900 <br />Description: Decom <br />Rated Payload: 35,400 <br />Payload Capacity: 12.21 <br />Pounds/LCY <br />rock - 50% Rock, 50% Earth <br />Pounds <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.