Laserfiche WebLink
5/5/2014 State.co.us Executive Branch Mail - Fwd: Bowie No. 2 Mine C1996083 MR150- Adequacy Review <br />Burgmaier - DNR, Susan <susan.burgmaier @state.co.us> Fri, May 2, 2014 at 3:47 PM <br />To: aetter @bowieresources.com, Bill Bear <BBear @bowieresources.com >, Jim Stover <jestover @bresnan.net> <br />Cc: Alysha Hernandez - DNR <alysha.hernandez @state.co.us> <br />Gentlemen - Please see the additional comments and request for information from CPW. Please provide DRMS <br />with a map showing the proposed location of the flume. Please also provide DRMS with an estimate of the time <br />that BRL will require for in- stream work. I will then forward the information to CPW. <br />Based on the information that Jim provided to the USFS, it looks like you are proposing to install just one flume. <br />Is that correct? The MR application indicated that there may be two installations. <br />Susan L. Burgmaier <br />Coat Regulatory Program <br />Department of Natural Resources <br />1313 Sherman Street, Room 215, Denver, CO *. <br />Susan- <br />We have been evaluating and discussing this request. So you know, this strain of cutthroat trout is listed under <br />the Endangered Species Act, and given the federal nexus a with a Army Corps permit a Section 7 Consultation <br />with the USFWS maybe required. <br />Can you send us the location of these structures, so we determine where in the watershed the impacts to <br />cutthroats may occur. In addition, can you provide and estimate of how long in stream construction activities <br />would occur during between June 1 and June 15? <br />Thanks, <br />Brian <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &view = pt &search =i nbox&th= 145bee9205cc3527 &si ml= 145bee9205cc3527 1/4 <br />