My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-02_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2014-05-02_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:44 PM
Creation date
5/2/2014 2:00:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Revision
Doc Date
5/2/2014
Doc Name
Updated Reclamation Cost Estimate
From
DRMS
To
Mike Savage
Type & Sequence
RN4
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 9 <br />BULLDOZER WORK <br />Task description: Rill /Gully maintenance, 3 times over 10 -years (Rule 3.02.1(7 <br />Site: Carbon Junction Mine Permit Action: RN -4 Permit/Job #: C1992080 <br />PROJECT IDENTIFICATION <br />Task #: 004 State <br />Date: 5/1/2014 County <br />User: JLE <br />Colorado <br />La Plata <br />Agency or organization name: DRMS <br />HOURLY EOt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />APMENT COST <br />Cat D3K XL - 3P <br />74 <br />Power Angle Tilt <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C080 -004 <br />Total unit Cost/Hour: $0.00 <br />Total Fleet Cost/Hour: $75.79 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,208 <br />Swell factor: 1.330 <br />Loose volume: 1,607 LCY <br />Source of estimated volume: Permit Map 1 (100,000 sf x 1 ft)/(27 cf per yd) <br />Source of estimated swell DRMS Estimate <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly 169.6 LCY/hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 7,000 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$11.21 <br />NA <br />Operating Cost/Hour: <br />$27.17 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $0.00 <br />Total Fleet Cost/Hour: $75.79 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,208 <br />Swell factor: 1.330 <br />Loose volume: 1,607 LCY <br />Source of estimated volume: Permit Map 1 (100,000 sf x 1 ft)/(27 cf per yd) <br />Source of estimated swell DRMS Estimate <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly 169.6 LCY/hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 7,000 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.