RL(e 1: Permits <br />• This process continues and additional contour cuts aze taken on the coal seams through the R or <br />Ciruela Seam. A contour cut on the lowest seam will be kept approximately 300 ft in advance of <br />the main mining area. The material from this contour cut is pushed or hauled in adjacent fills. A <br />solid berm is left along the outcrop to keep material from going down slope in areas not adjacent <br />to valley fills or spoil transportation zones. A second contour cut is taken on the exposed this cut <br />will be pushed or hauled to adjacent valley fills. The contour cuts will be repeated until a core is <br />left in the center of the ridge. Material from these cuts will be pushed, cast, or hauled to adjacent <br />areas on the bench of the lowest seam and the outslopes graded to approximate final contours. <br />Material from the core will be pushed, cast, or hauled to adjacent azeas on the bench. A portion <br />of this material will be rehandled to expose and recover the lower coal seams. When the lowest <br />coal seam is recovered, the spoil on the bench will be pushed with dozers to achieve the final <br />contours and covered with topsoil or suitable material. This process will continue until an east <br />and west face is established on both sides of the ridge. <br />Figure 2.05.3-5 illustrates the location of the temporazy office and parts trailers. <br />• <br />• <br />Page 2.05-5 and Sa Aule 2 Permits.doc 2,05-5a (revised 02/ 19/03) <br />