Laserfiche WebLink
i <br />140.0 <br />a 135.0 <br />130.0 <br />125.0 <br />120.0 <br />W 115.0 <br />U <br />a_ <br />z 110.0 <br />W <br />O <br />M 105.0 <br />0 <br />1 <br />• ' EOTEC <br />Civil, Structural & Geotechnical Engineers <br />95.0 <br />222 So. Park Ave. Madrosa, Colorado 81401 <br />�J <br />85.0 <br />9702498828 Fax No. W0. 249 -0945 <br />80.0 <br />STANDARD PROCTOR AASHTO TA9 <br />Project name <br />Bowie Resources Gob Pile Stability <br />Date <br />Location <br />Bowie Gob Pile <br />0921105 <br />Sample # <br />#2 <br />Project # 05- 126 -CMT <br />Soil description <br />coal waste <br />Sample by BW <br />Comments <br />Test by SM <br />Test for SR <br />Number of blows per layer: 25 <br />Hammer Weight: 5.5 lb <br />Number of layers: 3 <br />Drop: 12 inches <br />Size of Mold: 4 inches <br />Scale #: 4 <br />Volume of Mold: 0.0333 ft3 <br />i <br />140.0 <br />a 135.0 <br />130.0 <br />125.0 <br />120.0 <br />W 115.0 <br />U <br />a_ <br />z 110.0 <br />W <br />O <br />M 105.0 <br />0 <br />1 <br />100.0 <br />95.0 <br />90.0 <br />�J <br />85.0 <br />J <br />80.0 <br />4% <br />J <br />5% 6% 7% 8% 9% 10% 11% 12% 13% 14% 15% 16% 17% 18% 19% 20% 21% 22% 23% 24% 25% <br />MOISTURE CONTENT <br />