Laserfiche WebLink
SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV- 2014 -001 <br />NATURE OF VIOLATION: <br />Failure to maintain Pond P9 discharge structure to minimize impacts to hydrological balance; and <br />Failure to properly maintain spillways and emergency spillways from a treatment facility. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT SECTION(S): 34- 33- 120(2)0)(V), 34- 33- 121(2)(i)(II), 34- 33- 120(2)(j)(II) and 34- 33- 121(2)(i)(II) <br />REGULATIONSECTION(S): Rules 4.05.7, 4.05.6(2), 4.05.6(4) and 4.05.9(2) <br />PERMIT SECTION(S): Permit C- 1981 -025 Drawings D -2 -5 and D -4 -6 <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />The primary and emergency spillways for Pond P9 <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) <br />Abatement Step 41 Submit a complete Technical Revision with a spillway design for Pond P9 in compliance with <br />Rules 4.05.6(4) and 4.05.9(2). <br />Abatement Step 42 Re- construct the spillways for Pond P9 to ensure the primary and emergency spillways are in <br />compliance with the approved revision and Rules 4.05.6(4) and 4.05.9(2). <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE last abatement due date <br />Due Date <br />Abatement Step 41 May 16, 2014 <br />Abatement Step 42 June 20, 2014 <br />