Laserfiche WebLink
C. Project Description. Describe all aspects of the operation including mining, milling, and exploration methods, materials, <br />equipment, workforce, construction and operation schedule, power requirements, how clearing will be accomplished, topsoil <br />stockpile, waste rock placement, tailings disposal, proposed number of drillholes and depth, depth of proposed suction <br />dredging, and how gravels will be replaced, etc. Calculate production rates of ore. Include justification and calculations for <br />settling pond capacities, and the size of runoff diversion channels. <br />PLEASE SEE ATTACHED <br />D. Equipment and Vehicles. Describe that which is proposed for use in your operation (Examples: drill, dozer, wash plant, mill, etc.). Include: <br />sizes, capacity, frequency of use, etc. <br />N/A <br />E. Structures. Include information about fixed or portable structures or facilities planned for the operation. Snow iocatluns un uic <br />map. Include such things as living quarters, storage sheds, mill buildings, thickener tanks, fuel storage, powder magazines, <br />pipelines, water diversions, trailers, sanitation facilities including sewage disposal, etc. include engineering design and geotechnical <br />information for project facilities, justification and calculations for sizing of tanks, pipelines and water diversions, etc. <br />TOOL SHED /CABIN <br />V. ENVIRONMENTAL PROTECTION MEASURES (SEE 36 CFR 228.8) <br />A. Air Quality. Describe measures proposed to minimize impacts on air quality such as obtaining a burning permit for slash disposal <br />or dust abatement on roads. <br />N/A <br />(If more space is needed to fill out a block of information, use additional sheets and attach form) <br />-3- <br />