My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-10_GENERAL DOCUMENTS - M2014011 (2)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2014011
>
2014-04-10_GENERAL DOCUMENTS - M2014011 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:07 PM
Creation date
4/30/2014 10:17:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014011
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/10/2014
Doc Name
Is It Mining
From
Strong Mining CO.
To
DRMS
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H, Reclamation. Describe the annual and final reclamation standards based on the anticipated schedule for construction, <br />operations, and project closure, include such items as the removal of structures and facilities including bridges and culverts, a <br />revegetation plan, permanent containment of mine tailings, waste, or sludges which pose a threat of a release into the environment, <br />closing ponds and eliminating standing water, a final surface shaping plan, and post operations moni €onng and maintenance plans. <br />Gate will be removed by hand and hauled out by truck. All metal parts of the cabinitoolshed will be removed and hauled <br />out. Cabin will be dismanteled, logs will be cut in short lengths and used on road to prevent use. Outhouse is to be <br />dismanteled and hauled out, hole filled and grass planted. Boadwalk 4dll be dismanteled and hauled out All materials <br />will be hauled to a proper disposal site. <br />V1, FOREST" SERMCE EVALUATION OF PLAN OF OPERATIONS <br />A. Required changeslmodifleationslspecial mitigation for plan of operations: <br />At the time of reclamation a gate will be installed across the mine portal to prevent access by members of the public, <br />B. Bond. Reclamation of all disturbances connected with this plan of operations is covered by Reclamation <br />Performance Bond No. , dated (mmldd/yy) , signed by (Principal) and (Surety), for the <br />penal sum of . This Reclamation Performance Bond is a guarantee of faithful performance with the terms and <br />conditions listed below, and with the reclamation requirements agreed upon in the plan of operations, This <br />Reclamation Performance Bond also extends to and includes any unauthorized activities conducted in connection <br />with this operation, <br />The bond amount for this Reclamation Performance Bond was based on a bond calculation worksheet. The bond amount may be <br />adjusted during the term of this proposed plan of operations in response to changes In the operations or to changes in the economy. <br />Both the Reclamation Per'onnance Bond and the bond calculation worksheet are attached to and made part` of this plan of <br />operations. Acceptable bond securities (subject to change) include; <br />1. Negotiable Treasury bills and notes whtch are unconditionally guaranteed as to both principle and interest In an amount <br />equal at their par value to the penal sum of the bond; or <br />Z Certified or cashler's check, bank drag, Post Office money order, cash, assigned certfcate of deposit, assigned savings <br />account, blanket bond, or an Irrevocable letter of credit equal to the penal sum of the bond. <br />rdf store sprtee is needed to fill out et I)J&L'rt of h1fortliatI011, USC trt1titt(ollaf ShCdS Ulilt aililCh foMnj <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.