Laserfiche WebLink
p,o MOT <br />112c Annual Report <br />RECEIVED <br />APP, 3 7 2014 <br />Division of reclamation. <br />Mining & Safety <br />Page 2 of 3 <br />Permittee Name: <br />Carder, Inc. <br />Permit Number: <br />M -2006 -054 <br />Operation Name: <br />Ordway Pit <br />County: <br />Crowley <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />March 26, 2014 <br />Permit Acreage: <br />98.00 <br />Current Bond Amt: <br />$50,146.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />,p oi mIf"YES" ease nte tm l to completion of reclamation, Rule 3.1.3. � I ` <br />tf?61F l A, 00Ui t ft <br />YES CNO'� <br />YES NO <br />YES NO <br />YES NO <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12 Total acres in various sta es of reclamation, since pe rmitted minin activities began: <br />YES <br />YES NO <br />Ana ' w) <br />s, <br />�rl <br />E� <br />Total acres <br />baekfilled: <br />�� --approved <br />Total acres <br />seeded w/ <br />mix: <br />/" - <br />lJ <br />Total acres <br />w /topsoil <br />replaced: <br />{ <br />t <br />Total acres <br />mulched w/ <br />approve mulch: <br />Total acres <br />graded: <br />Total acres <br />fertilized w/ <br />a vd fertilizer: <br />V <br />Topsoil <br />replacement <br />depth (in.): <br />Mulch application <br />rate (tons /ac): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />method: <br />ld I <br />application <br />method: <br />, I <br />application <br />I method: <br />f , <br />!J <br />