Laserfiche WebLink
6.4.12 Exhibit L <br />Reclamation Costs <br />Reclamation cost estimate was calculated on a per acre basis and applied to <br />maximum active mining area of 70 acres. As stated in the Reclamation Plan, <br />reclamation will occur concurrently with mining not only to minimize affected area at <br />any one time but also to reduce the need for overburden and topsoil stockpiles. <br />Direct Tasks Unit <br />Placing topsoil and <br />fines <br />Bull dozer hours <br />Loader hours <br />Seeding <br />Broadcasting <br />Seed mix <br />Mulch <br />Tracking seed and <br />mulch <br />Dozer <br />Affected Area <br />Reclaimed <br />Mobilization fee <br />$ 100.00 <br />hours <br />acre <br />acre <br />0.33 <br />$ 145.00 <br />hours <br />Subtotal <br />acre <br />0.33 <br />hours <br />Indirect Tasks <br />Liability insurance <br />Performance bond <br />Profit <br />Job Superintendent <br />Miscellaneous indirect <br />jantity Cost <br />$ 100.00 <br />$ 100.00 <br />0.33 <br />$ 145.00 <br />0.33 <br />$ 145.00 <br />Subtotal <br />$ 1,137.92 <br />0.33 <br />$ 300.00 <br />1 <br />$ 350.00 <br />1 <br />$ 187.50 <br />Subtotal <br />$ 11,659.86 <br />0.33 <br />$ 154.00 <br />Subtotal <br />e <br />Total Cost <br />$ 47.85 <br />$ 47.85 <br />$ 95.70 <br />$ 99.00 <br />$ 350.00 <br />$ 187.50 <br />$ 636.50 <br />50.82 <br />1,515.22 <br />75,761.00 <br />13 <br />$ 100.00 <br />$ 100.00 <br />Direct Expenses <br />Total $ 75,861.00 <br />0.0155 <br />$ 1,175.85 <br />0.015 <br />$ 1,137.92 <br />0.1 <br />$ 7,586.10 <br />20 <br />$ 88.00 <br />$ 1,760.00 <br />Subtotal <br />$ 11,659.86 <br />0.0925 <br />$ 8,095.68 <br />Total Bond $ 95,616.54 <br />13 <br />