My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-25_PERMIT FILE - C1982056A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2014-04-25_PERMIT FILE - C1982056A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:26 PM
Creation date
4/29/2014 12:41:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
4/25/2014
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
supports, transformers, and associated control and electrical switch -gear. The existing 24 -inch culvert, in the <br />substation location, was extended approximately 120 feet to convey drainage under the substation area. <br />6MN Reservoir Powerline (MR08 -232) <br />A new powerline was extended approximately 1,500 feet between existing electrical Substation 12 (NW <br />Ventilation Fan) and the eastern edge of the proposed 6MN Reservoir. Powerline construction involved the <br />minimal disturbance required to place 15 powerpoles and string conductors, with pole placement avoiding the <br />Fish Creek buffer zone. The powerline construction project was necessary to supply power for pumps at the <br />6MN Reservoir. Exhibit 49R illustrates the powerline/pole locations. <br />15LT Powerline and Transformer (MR11 -258) <br />A new powerline will be constructed from primary Substation 14 (18 -Left Ventilation Shaft) to supply power to <br />the 15 -Left Ventilation Borehole installation. The new powerline will extend approximately 8,550 feet, and will <br />require the placement of up to 40 new powerpoles. A transformer at Substation 14 will convert the incoming <br />69KV power to 12,470V for distribution to 15LT. Powerline construction will involve the minimal disturbance <br />required to place powerpoles and string conductors, with pole placement avoiding the Fish Creek buffer zone. <br />Construction of a new powerline is necessary because the nearby distribution line from the Fish Creek Water <br />Treatment Facility does not have sufficient capacity to meet the power requirements for the 15LT installation. <br />Exhibit 49Y illustrates the powerline /pole locations. <br />MRl 1-258 2.05 -47.1 10/25/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.