ACTUAL PEAK DISCHARGE (CFSI 4.4 <br />"V"Ditch <br />Width (ft) 3.0 <br />Depth (ft) 3.0 <br />• <br />Flow Depth (fr) 1.3 <br />Freeboard (ft) 1.7 <br />Sideslopes(ft:ft) 1:1 <br />Ditch Slope (%) 1.0 <br />Velocity (fps) 2.6 <br />DITCH CALCULATIONS <br />Peak Flow = 4.4 cfs <br />Use "V" Ditch <br />Z = 1:1 Sideslopes <br />S = 1 % Slope <br />N = 0.03 S <br />Q = AV - 1.49 R~~3 Spa A <br />n <br />Q = AV = 1.49 Zd"' (S)~ (Zd)~ <br />0.035 2Z2+1 <br />4.4 = 42.57 d (0.01)~(d~) <br />2.8 <br />1.034 = d"' d~ <br />2.8 <br />. d=1.3ft <br />Flow Depth = 1.3 ft <br />Freeboard = 1.7 R <br />Ditch Depth = 3.0 ft <br />Q = AV <br />V = Q/A = 4.4/Zd2 <br />= 4.4/(1)(1.3) <br />= 2.6 fps <br />No further sediment control is proposed for this area other than controlling overland flow with the diversion ditch. <br />Based upon the track alignment, approximately 500 CY' were excavated during the cut and fill process. The fill <br />material was compacted per the requirements of the UP. Cut and fill slopes were seeded with the pastureland seed <br />mixture to stabilize the slopes until they are reclaimed. <br />After the cut and fill work was completed, approximately 200 CY of pit-run gravel was hauled in and used for <br />roadbed. The tie and rails were laid, and approximately 200 CY of ballast was placed to anchor the ties. A <br />deadman or berm was constructed at the end of the extension. Runoff from the site was intercepted by a silt fence <br />during construction, the area was revegetated, and a ditch cut was established around the topsoil stockpile to direct <br />any runoff from it into the silt fence. <br />When the railroad spur is no longer needed, the original track and extension will be removed and the area <br />reclaimed. Specifically for the extension, the ties and rail will be removed and then the fill material will be used to <br />backfill the cut areas. The combined 400 CY of the ballast and pit-run gravel will also be used as back&11. The <br />following pazagraph applies to the extension of the railroad behind Pinnacle Peak. <br /> <br />TR06-53 2.OS-36 06/20/06 <br />