The Washplant Feed Conveyor discharges to a surge bin, with water added at the transfer point. Feeders draw from <br />the surge bin to feed the coal to a series of screens, heavy -media cyclones (using a slurry of magnetite and water to <br />separate the coal from the heavier refuse material), classifying cyclones, wash screens, and centrifuges, producing <br />both a coarse and fine coal product, which are combined and discharge to the Overland Conveyor. Coal refuse is <br />separated from the coal stream in the cyclones, with the coarse refuse passing over screens to drain and then to the <br />Coal Refuse Conveyor, and the fine refuse being transferred to the Thickener to reduce water content. The <br />Washplant will require approximately 600 gpm of make -up water, to address losses to the coal product, coarse <br />refuse, and fine refuse streams (note that most of the water from the fine refuse stream is recovered and recycled to <br />the Mine water supply system, which include the washplant feed water). The coal preparation circuit also includes <br />the magnetite recovery and recycling system, and a water filtration and recycle system, to minimize water use <br />requirements. The coal preparation equipment, along with associated chute -work, and control and monitoring <br />systems, are housed in the Washplant Building, a steel frame building with steel siding and roof (55 x 125 x 80 feet <br />high), which sets directly over the Overland Conveyor. The building sets on a reinforced concrete slab (58 x 128 x <br />1 foot thick). <br />The Coal Refuse Conveyor (48 -inch belt w/500 tph capacity), transfers coarse coal refuse from the Washplant to a <br />Refuse Bin. The Refuse Bin is used to load trucks, which haul the coal refuse material to the existing permitted <br />Coal Refuse Disposal area. The Coal Refuse Conveyor is designed to handle current requirements of 500 tph, as <br />well as possible future system expansion. The Refuse Conveyor is supported by two steel support bents, and <br />utilizes the typical conveyor construction. The conveyor bents set on reinforced concrete caissons, as previously <br />described. The Refuse Bin is a steel frame building (30 x 30 x 50 feet high) with steel siding and roof which <br />supports a 200 -ton pre- fabricated steel surge bin and contains minor chute -work and a dust collection system. The <br />Refuse Bin sets on a reinforced concrete slab floor. <br />The Washplant II Thickener, which is used to partially dewater the fine coal refuse, is a reinforced concrete tank <br />approximately 50 feet in diameter, and 12 feet high. A flocculating agent is introduced into the tank, and a high - <br />efficiency underflow system mixes the flocculant with the fine refuse stream, causing the refuse particles to <br />agglomerate and settle from suspension. The decant water discharges through a filter and is recycled to the <br />Washplant. The fine coal refuse slurry normally discharges through either an 1,800 -foot, 6 -inch diameter discharge <br />line (SWMD) or an 9,600 foot 6 -inch pipeline (EMD) connecting to 8 -inch drop - boreholes and underground piping <br />system, which carry the slurry to areas of sealed underground mine workings. Underground, water decants from <br />the fine refuse slurry and flows downgradient to sumps where a pumping system is used to recover and recycle the <br />water. In order to address emergency mine dewatering requirements, slurry may be temporarily diverted to an <br />incised basin within the Area 1 Pit permitted mine refuse disposal area, with decant of clarified water to the Area 1 <br />Pit Mine Water Storage Reservoir. Coal fines that accumulate in this temporary basin will be allowed to dry -out <br />and will then be transferred to the permanent Coal Refuse Disposal area. <br />TC has completed or will complete thickener underfloor boreholes in both the SWMD and the EMD, and thickener <br />underflow pipelines to convey fine coal refuse, as a slurry, from the washplants to these locations. The 1 MN Thickener <br />Underflow Borehole is located to the west of the previous CYCC Office Building (Brown Palace) location, along the <br />existing light -use road, and extends approximately 310 feet into the sealed and abandoned mine workings in the <br />SWMD. The 6RT Thickener Underflow Borehole installation is located southeast of the intersection of Routt County <br />Roads 27 (RCR27) and 33 (RCR33), on the north side of Foidel Creek and the Twentymile Mine railroad spur. The <br />Thickener Underflow Borehole extends approximately 540 from the surface into the sealed EMD mine workings. An <br />existing light -use road extends approximately 250 feet from RCR33 to this location. The 7RT Thickener UnderflowN <br />Borehole installation will be located east of both the intersection of Routt County Roads 27 (RCR27) and 33 (RCR33) <br />and the 6RT Borehole, on the north side of Foidel Creek and the Twentymile Mine railroad spur. The 7RT Thickener <br />Underflow Borehole will extend approximately 850 feet from the surface into the sealed EMD mine workings. The <br />2MN Thickener Underflow Borehole installation will be located near the north edge of the existing Mine Facilities <br />Area, between the existing Weld Shop and the Twentymile Railroad Spur and will be accessed by a short (550 feet) <br />access road from the existing mine road. The Thickener Underflow Borehole will extend approximately 150 feet from <br />the surface into the existing active 2MN No. 6 Mine Entry. From this location, the coal slurry will be piped <br />underground approximately 2,650 feet and 3,850 feet, respectively, to horizontal boreholes into the sealed 7 -Right and <br />8 -Right Panels in the Eastern Mining District (EMD). <br />MR13 -273 2.05 -32.3 12/06/1 <br />