My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-25_REPORT - M1989065
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1989065
>
2014-04-25_REPORT - M1989065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:26 PM
Creation date
4/25/2014 3:45:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989065
IBM Index Class Name
REPORT
Doc Date
4/25/2014
Doc Name
Annual report & map No fee
From
Schmidt Construction Company
To
DRMS
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ - Mining Phase Line <br />— . — . — . — . _ Permit Boundary <br />— — — . Access Road (Main Road) <br />Direction of Mining <br />Affected Land on <br />this map <br />Acreage Inventory (Cut Stone Only) <br />Total Affected = 7.98 acres (not <br />including main road affected land) <br />Quarry = 1.1 acres <br />Stripped = 0.34 acres (future <br />mining) <br />Soil stockpiles = 0.32 acres <br />Product stockpile areas = <br />2.72 acres <br />Misc (connecting road) <br />0.76 acres <br />NO CHANGES IN 2013 <br />Winkler Light Aggregate Quarry <br />M- 1989 -065 <br />Annual Report Map 3 <br />Cut Stone Quarry Detail View <br />Year: 2014 <br />Anniversary Date: April 26 <br />N <br />Contour interval = 20 ft <br />400 200 0 400 <br />1 " = 400' <br />...................................................................................................... ..............................: <br />/ ■ <br />_ i <br />, <br />f <br />Soil Stockpiles — <br />: <br />i i, co <br />i Soil Stripp d Quarry <br />• i I 1 a`�'a`��a I <br />i <br />• a� <br />i � <br />} <br />y <br />-- \_ -r •� <br />i <br />■ <br />i <br />Stockpile of unsuitable cutstone. <br />• Periodically hauled to main quarry and crushed. 29-28 <br />- <br />324 3 <br />% .......................... ................,.............. ......................................................... <br />i <br />RECEIVED <br />APR 2 5 2014 <br />Division of Reciamation, <br />Mining & Safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.