Laserfiche WebLink
112c Annual Report <br />RECEIVED <br />APR 2 4 2014 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />Page 2 of 3 <br />Permittee Name: <br />Grand County <br />Permit Number: <br />M -1984 -156 <br />Operation Name: <br />Grand Cnty No 201 aka Scholl Gravel <br />Pit <br />County: <br />Grand <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />Ma 29, 2014 <br />Permit Acreage: <br />41.84 <br />Current Bond Amt: <br />$0.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NOS <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? 0%y <br />5. Does the mine operate more than 180 days per year <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since p ermitted mining activities began: <br />YES GN <br />YES NO <br />NO <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />J /_/ <br />seeded w/ <br />f <br />w /topsoil <br />,i <br />11A <br />mulched w/ <br />/x A � <br />approved mix: <br />r laced: <br />d" <br />approved mulch: <br />�V <br />Total acres <br />Total acres <br />Topsoil <br />// <br />Mulch application <br />graded: <br />fertilized w/ <br />��i� <br />replacement <br />rate (tons): <br />I <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />application <br />/�%��� <br />�'" <br />Fertilizer <br />application <br />Mulch <br />application <br />j / /� <br />method: <br />i� <br />method: <br />method: <br />/l/ T— <br />