Laserfiche WebLink
Gob Pile #2 - Material Balance <br />Coverfill In -Place <br />In- Place; Required <br />Volume Salvaged Amount <br />CY CY <br />Coverfill In- Place: <br />Bench #1 28,459 24,902 <br />------- --- Benc-es 21----------------------------------------------- -- -- ---- - - - -- -27,2 3 <br />Gob #2 Benches 2/3/4 27,233 27,233 <br />Gob Pile #1 7,228 6,324 <br />Subtotal: 58,459 Coverf/ /already in p /ace <br />Coverfill Available for reclamation, In stockpile: <br />Coverfill Pile -West 35,000 In Stockpile <br />Coverfill Pile -East 44,537 In Stockpile <br />Top of Gob Pile #4 13,400 <br />------------------------------------------------------------------------------- <br />Subtotal: 92,937 <br />Total Coverfill Required for Reclamation of gob pile #2: 263,135 CY <br />In -Place Coverfill: 58,459 CY <br />Coverfill in Stockpile, available for reclamation: 92,937 CY <br />Coverfill that must be borrowed /salvaged 111,739 CY <br />Coverfill available for salvaae to complete reclamation, <br />(location): <br />TR -79 Excess Coverfill (to be salvaged) <br />14,000 Calculated /Estimated <br />From Gob Pile #3 Area (to be salvaged) <br />55,539 Calculated <br />Adjacent Borrow area #1 - Gob Pile #2 area <br />7,200 Calculated <br />Adjacent Borrow area #2 - Gob Pile #2 area <br />30,000 Calculated <br />Adjacent Borrow area #3 - Gob Pile #2 area <br />5,000 Calculated <br />Total: <br />111,739 <br />trial Balance <br />In- Place; <br />Volume Salvaged <br />CY <br />Coverfill available to complete reclamation, (location): <br />Coverfill Pile (East) 24,140 <br />Coverfill Pile (West, In Gob Footprint) 28,424 <br />Subtotal: 52,564 Coverfllinstockpile <br />Coverfill Required for Reclamation of gob pile #3: 82,183 CY <br />Coverfill in Stockpile, available for reclamation: 52,564 CY <br />Coverfill that must be salvaged in pile #3 area 29,619 CY <br />Coverfill salvage necessary to complete reclamation at Pile #2 and #3 <br />CY <br />Total: 85,158 <br />*Amount necessary for reclamation equates to a salvage depth of 17.5' in <br />footprint ofgob pile #3 where the west coverfill pile is currently located - <br />If necessary, salvage depth could be increased to provide additional <br />coverfill for reclamtion ofgob piles 2 -4. <br />