Laserfiche WebLink
Basil Bear, Bowie Resources, LLC <br />C- 1981 -038 / TR -58 PAR <br />22- Apr -2014 <br />Page 4 of 4 <br />the minimum Phase 111 bond release criteria outlined in the permit (Vol. 1, 2.05 <br />Operation and Reclamation Plans Part 2, page 75). <br />The Division is not requesting that the data be amended at this time for two reasons: <br />i) The revision is not requesting bond release, and <br />ii) The changes in cover values are minor (less than 1%). It should be noted <br />however, in fixture vegetation data reports Cheatgrass and all other State listed <br />noxious weeds cannot count towards any reclamation standard. <br />This concludes the Division's preliminary adequacy review. Please contact me with any <br />questions you may have. <br />Sincerely, <br />Marcia L. Talvitie, P.E. <br />Environmental Protection Specialist <br />cc: Jim Stover, P.E - J.E. Stover & Associates, Inc. <br />