3.0 Engineering Design and Construction Plans: All engineering designs and <br />construction plans provided by Property Owner shall include, at a minimum, geotechnical data, <br />ingress /egress entrance intersection layouts, existing and proposed grading, drainage designs, <br />storm drainage pipe sizings and inverts, a cross section of the base /asphalt, approach roads and <br />adequate turning radii, and pavement markings. In addition, a geotechnical asphalt pavement <br />design to accommodate heavy truck traffic, prepared by a Professional Engineer licensed to <br />practice in Colorado, is required for WCR 58 and WCR 53. These plans, when reviewed and <br />accepted by the Weld County Engineer, shall be a part of the Plans, which are a part of this <br />Agreement. All Plans showing work within the County right -of -way shall be reviewed and <br />accepted by Weld County prior to the start of construction. For all construction in the County <br />right -of -way, prior to issuance of any access permit or right -of -way permit, a construction <br />schedule giving times and locations of all proposed improvements shall be provided to Public <br />Works for review and acceptance. <br />4.0 Construction Standards: All construction and materials controls for designated <br />improvements shall conform to the requirements in effect as the time of the completion of the <br />improvements set forth in the "Standard Specifications for Road and Bridge Construction" <br />provided by CDOT. <br />5.0 Traffic Control: Prior to construction in the County right -of -way and as a <br />condition of issuance of any access permit or right -of -way permit, the applicant shall submit a <br />traffic control plan for County review. During construction, signage shall be posted in <br />accordance with the then current version of the "Manual of Uniform Traffic Control Devices ". <br />6.0 Off -Site Dust Control - Not Applicable as the haul route is paved <br />7.0 Future Improvements: Future improvements to the haul route(s) may be required <br />by County for reasons related to: changes in site activity or truck circulation patterns and <br />numbers, roadway classification changes, and newly permitted facilities affecting the haul route <br />traffic usage. Property Owner shall pay a proportionate cost share of future improvements not <br />described herein based on the Property Owner's percentage of total truck trips using then current <br />data on the haul route in the implementation of the above - mentioned improvements. County <br />personnel alone shall make all determinations regarding the gathering of and use of traffic data <br />when making decisions regarding cost sharing. <br />8.0 Timing of Improvements: Property Owner shall not be required to complete the <br />aforementioned offsite improvements until the occurrence of the triggering event for each <br />improvement which shall be the issuance of the grading permit or Right -Of -Way access permit <br />resulting from the commencement of activities on the property(s) or as described below. At that <br />time, Property Owner agrees that the required collateral will be posted and all on -site and offsite <br />improvements shall commence and shall be completed within the parameters established in <br />Section E. -7.2 and Exhibit B, herein. In the event weather or other conditions, circumstances or <br />events beyond the control of Property Owner prevent completion of offsite improvements prior <br />to issuance of a grading permit or Right -Of -Way permit, Property Owner shall be allowed to post <br />required collateral for the completion of such offsite improvements as a temporary substitute for <br />such completion, under terms and conditions that are acceptable to Property Owner and County. <br />111111111111111111111111 IN 1 <br />3791261 09/09/2011 11:42A Weld County, CO <br />3 of 17 R 0.00 O 0.00 Steve Moreno Clerk & Recorder <br />