My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-21_HYDROLOGY - M1977348
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977348
>
2014-04-21_HYDROLOGY - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:15 PM
Creation date
4/22/2014 3:16:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
HYDROLOGY
Doc Date
4/21/2014
Doc Name
First quarter 2014 groundwater sampling at the Boettcher Quarry
From
Golder Associates
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R D <br />Golder <br />APR 21 2014 <br />/ V^ <br />Associates DIVISION OF " ECLAMATION <br />MINING 1111E) sff ff" <br />April 16, 2014 Project No.: 1400159 <br />Mr. Eric Scott <br />Colorado Division of Reclamation Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 /97.7 8 <br />RE: J//FIRST QUARTER 2014 GROUNDWATER SAMPLING AT THE BOETTCHER QUARRY <br />Dear Mr. Scott: <br />On behalf of Holcim (US) Inc., Golder Associates Inc. is pleased to submit analytical laboratory results for <br />the first quarter 2014 groundwater sampling event at the Boettcher Limestone Quarry near La Porte, <br />Colorado. Attached are tables summarizing the results and a copy of the laboratory report. In addition to <br />sampling wells MW -1 through MW -7, a field duplicate at MW -5 (MW -20) and a field blank (MW -15) were <br />collected. The locations of monitoring wells MW -1 through MW -7 are presented in Figure 1. <br />If you have any questions, please do not hesitate to call the undersigned at (303) 980 -0540. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />L <br />ara Harkins <br />Geologist <br />Attachments: <br />Table 1: Summary of Monitoring Results for MW -1 <br />Table 2: Summary of Monitoring Results for MW -2 <br />Table 3: Summary of Monitoring Results for MW -3 <br />Table 4: Summary of Monitoring Results for MW -4 <br />Table 5: Summary of Monitoring Results for MW -5 <br />Table 6: Summary of Monitoring Results for MW -6 <br />Table 7: Summary of Monitoring Results for MW -7 <br />Figure 1: Location Map <br />Attachment A: ACZ Laboratory Report <br />,l? . ryll 41`111 � <br />Randy March, P.E., P.G. <br />Principal Geological Engineer <br />i:\14 \1400159 \0110\boettcherquarry gwsampl q1 2014_fnl- 16apr14ftettcherquarry gwsamp q1 2014_fn1- 16apr14.docx <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 �f <br />Lakewood, CO 80228 USA <br />Tel: (303) 980 -0540 Fax: (303) 985 -2080 www.golder.com r� <br />Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America <br />Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.