Susan Burgmaier -5- April 22, 2014 <br />11. DRMS: Once the material balance has been finalized, prior to approval of TR -77, <br />the reclamation cost estimate will likely need to be updated to reflect the final material <br />handling plan (material volumes, stockpile locations, and haul distances). <br />BOW2: Comment noted. <br />Please feel free to contact me if you have any questions. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Enclosures- <br />Volume II: Map 32 <br />Volume IX: Appendix A <br />Volume XI: Pages 2 & 4, Appendix A <br />