My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-22_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-04-22_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:18 PM
Creation date
4/22/2014 1:53:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
4/22/2014
Doc Name
Revised Adequacy Response #3
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
TR77
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />April 22, 2014 <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Technical Revision #77, Substitute Topsoil Plan <br />Adequacy Response #3 (Revised) <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />The DRMS' letter dated February 10, 2014 requested additional information. A third <br />adequacy response was submitted March 26, 2014. An inspection report was <br />submitted to Bowie Resources on April 4, and requested an in -field survey of all coverfill <br />resources at gob pile #2 and #3. The information gathered from that survey <br />necessitated a revision to the material balance (Appendix A for both gob piles), Map 32 <br />and page 4 (Volume XI) previously supplied for the third adequacy response. <br />On behalf of Bowie Resources, LLC, enclosed is the revised data, and for convenience, <br />changes to the letter are hi- lighted in yellow: <br />1. DRMS /BOW2: Item resolved. <br />2. DRMS /BOW2: Item resolved. <br />3. DRMS /BOW2: Item resolved. <br />4. DRMS /BOW2: Item resolved. <br />5. <br />a. Item resolved. <br />b. BRL, with revised Map 32 and Appendix A of Volume IX, has provided locations and <br />volumes of material stockpiles, as requested by the Division. <br />i. Appendix A indicates that there is a total of 263,719 cy of cover material <br />
The URL can be used to link to this page
Your browser does not support the video tag.