Laserfiche WebLink
Table of Contents <br />EXECUTIVE SUMMARY <br />1. INTRODUCTION <br />1.1 Terms and Conditions <br />1.2 Purpose and Scope of Work <br />1.3 Project Description <br />2. LAND DISTURBED IN 2013 <br />3. RECLAMATION ACTIVITIES IN 2013 <br />3.1 Constructed Wetlands Areas and Adjacent Slopes <br />3.2 Tie Camp Creek Disposal Cell <br />3.3 Drainage and Erosion Control in the North and South pits and Waste Rock dumps <br />4. MONITORING AND ANNUAL REPORTING <br />4.1 Slope Movement Vector Analysis <br />4.2 Inclinometer Evaluation <br />4.3 Pinnacle Mine Workings Monitoring <br />4.3.1 Spring and Seep Monitoring <br />4.3.2 Groundwater Levels <br />4.3.3 Pinnacle Adit Flow <br />4.4 Sediment Control Embankment <br />4.5 Waste Rock Dumps <br />4.6 Water Quality Monitoring <br />4.7 Radioactive Materials License <br />5. INSPECTIONS <br />6. SURETY <br />7. LAND OWNERSHIP <br />8. MONITORING & RECLAMATION ACTIVITIES PLANNED FOR 2014 <br />9. REFERENCES <br />Tables <br />Table 1 Spring and Seep Summary of Activity (1995 -2013) <br />Figures <br />Figure 1 <br />Site Location Map <br />Figure 2 <br />2008 Reclamation Areas <br />Figure 3 <br />Site Layout with Monitoring Stations <br />Figure 4 <br />Water Level Elevation Data <br />Figure 5 <br />Hydrograph of Pinnacle Adit Discharge <br />Figure 6 <br />Pinnacle Adit Discharge <br />Figure 7 <br />Land Ownership <br />Pitch 2013 Reclamation Report 14April2014.Docx <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />3 <br />3 <br />5 <br />5 <br />19 <br />19 <br />20 <br />21 <br />21 <br />22 <br />23 <br />23 <br />24 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />