My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-17_REPORT - M1977004
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977004
>
2014-04-17_REPORT - M1977004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 11:00:06 AM
Creation date
4/21/2014 10:49:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977004
IBM Index Class Name
Report
Doc Date
4/17/2014
Doc Name
Annual Fee/Report/Map
From
Homestake Mining Company
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pitch Reclamation Project Colorado Mined Land Reclamation Board — 2013 Annual Reclamation Report <br />8. MONITORING & RECLAMATION ACTIVITIES PLANNED FOR 2014 <br />In addition to the continued monitoring of pit slope stability and water quality, Homestake continues to <br />move forward with final closure and reclamation of the Pitch property. During 2014, the following <br />activities are planned: <br />• Continue to monitor the Tie Camp Creek Disposal Cell for depressions where water could pond, <br />and manage the drainage off and around the cell; <br />• Inspect and reseed drainage and erosion repairs made in 2012 on the upper benches of the Tie <br />Camp Creek and groin area on the west side of the Indian Creek rock dumps; <br />• Planting of tree seedlings in selected areas of the rock dumps and pits slopes; <br />• Continue to monitor the constructed wetlands located in the drainage area in the vicinity of the <br />former RTP including placement of additional organic material (e.g. peat), transplanting cattails <br />from similar elevations; and other enhancement activities to further promote sediment control; <br />• Monitor the drainage channels on the east and south walls of the North Pit and the east wall of <br />the South Pit and in other areas throughout the property and make improvements as necessary; <br />• Clean sediment traps in Indian and Tie Camp creeks; <br />• Inspect and replace, as necessary, the pump in piezometer P -4 and install new level Troll 500, In- <br />Situ level transducer in P -7; <br />• Continue to use level Troll 500 in 1030OR and 10370R for a more accurate water level readings; <br />• Assess the area where the straw bales were placed in the North Pit in 2010 and inspect and <br />maintain the diversion ditch installed in 2012 between the 10800 and 10600 levels on the east <br />wall of the North Pit; <br />• Continue to inspect and remove tree seedlings on the upstream and downstream face of the <br />Sediment Embankment; <br />• Continued noxious weed control management using Milestone with Telar XP and Escort XP w/R- <br />11 Activator; <br />• Conduct monthly and quarterly monitoring and reporting pursuant to the CDPS permit at the POC <br />SW -33 for water releases; <br />• Conduct annual surveys of the slope monitoring monuments and inclinometers; <br />• Inspect and monitor the sediment control embankment; and <br />• Grade all roads for safe travel ways into and around mine site. <br />Pitch 2013 Reclamation Report 14April2014.Docx 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.