Laserfiche WebLink
Pitch Reclamation Project Colorado Mined Land Reclamation Board — 2013 Annual Reclamation Report <br />k <br />'. S40 <br />AO <br />Photograph 10: South Pit looking North with diversion ditch installed in 2012 <br />and reseeded in 2013 <br />Tie Camq Creek Rock Dum <br />In 2012, repair work was completed on the top three benches and dump slope faces between benches to <br />remove sediment build up that was directing snow melt and storm water down the dump face and <br />creating rill erosion. Photographs 11 -19 show the sedimentation, erosion and repair work done in 2012. <br />Based on monitored in 2013, the repair work completed in 2012 has resolved issues on the top three <br />benches. <br />Pitch 2013 Reclamation Report 14Apri12014.Docx 10 <br />