Laserfiche WebLink
Pitch Reclamation Proiect Colorado Mined Land Reclamation Board — 2013 Annual Reclamation <br />2. LAND DISTURBED IN 2013 <br />All surface disturbance in 2013 was associated with effectively conveying snow melt and storm water on <br />the across the mine site to minimize erosion and siltation on areas previously disturbed during historical <br />mining. Work included monitoring the erosion and drainage repairs done over that past two years on the <br />first three benches of the Tie Camp Creek rock dump to remove accumulated silt, to facilitate snow melt <br />and storm water runoff from each bench to adjacent areas and to reduce erosion; monitoring the <br />effectiveness of grading and placement of boulders and riprap in the groin areas west of the Indian Creek <br />rock dump to control and dissipate runoff in 2012; cleaning of sediment traps on lower Indian and Tie <br />Camp creeks to prevent heavier sediment from entering the Sediment Pond; monitoring the effectiveness <br />of grading in the east wall of the North Pit to facilitate movement of water from the 10,800 bench to the <br />10,600 bench; and grading in the South Pit to prevent water from ponding near the slump area. All <br />activities occurred on ground already disturbed for project related facilities. <br />Pitch 2013 Reclamation Report 14April2014.Docx <br />