My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-16_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-04-16_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:11 PM
Creation date
4/21/2014 8:45:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/16/2014
Doc Name
Weekly construction quality assurance report week ending 4/12/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•.v <br />u) Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation (snow removal and runoff from melting snow and ice). <br />CQA ACTIVITIES: <br />i) Field Activities: Observation of construction activities during this reporting period included: Slope grading and fill <br />placement; Ambient and fill temperature monitoring and recording; Underground working remediation and confirmatory <br />drilling; Production drilling and blasting; Water pond construction; Testing and sampling for %2:1 slope grout, SF, DCF <br />and SLF; Geophysical surveying; 100 -mil LLDPE SSMS and smooth geomembrane delivery and inventory. <br />u) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density relationships, gradations, material classification, identifications, and field material sampling were <br />performed during this reporting period. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Structural fill sample numbers SF -68R through SF -69R <br />Drain Cover Fill sample DCF 70 <br />Soil Liner Fill sample number SLF 129 -S through SF -134S <br />Cast grout cubes for strength testing from the %:1 slope <br />Cast concrete cylinders for strength testing from the water stand pond. <br />Note: Samples labeled with the suffix "R" are samples of Record I QA samples; those without are QC samples. <br />General Proiect Items <br />Meetings and Discussions: <br />The kickoff meeting for the PSSA Geophysics survey occurred with AMEC, CC &V, and Ames on April 7, 2014. <br />A Highway 67 meeting occurred with AMEC, CC &V, CDOT, and Ames on April 7, 2014. The meeting addressed <br />the in place punch list items. <br />The Contractor Meeting occurred on April 9, 2014 with CC &V Projects, AMEC, and Ames. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, AMEC, and Ames. <br />Miscellaneous: <br />Drain cover fill processing continued. <br />Rip rap processing continued. <br />Work on the Water Stand Pond continued. <br />Geophysical surveying began in the PSSA. <br />Deliveries: <br />One (1) truckload consisting of 10 rolls of 100 mil LLDPE SSMS geomembrane and 2 rolls of 100 -mil smooth LLDPE <br />geomembrane were delivered to the site, recorded, and inventoried. Total received to date: <br />Y 206 rolls of 100 -mil smooth LLDPE geomembrane. <br />Y 214 total rolls of 100 -mil LLDPE SSMS geomembrane. <br />)- 270 total spools of LDPE 5mm weld rod. <br />Page 3 of 7 MLE2 NVE 12 April 2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.