Laserfiche WebLink
12. Primary future (Post - mining) land use (check one): <br />13 <br />J_j Cropland(CR) jJ Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />ElResidential(RS) Recreation(RC) <br />ElDeveloped Water Resources(WR) <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />WE <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Site will be mined using scrapers, bulldozers, front -end loaders, excavators or similar equipment <br />15. On Site Processing: - Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Material will be transported by haul truck to south end of the site for sorting /crushing /screening /processing. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The operator is adding 2.65 acres to the permit boundary. <br />