Laserfiche WebLink
The impoundments have the following estimated capacities: <br />IMPOUNDMENT CAPACITIES - ACRE FEET <br />Water <br />Sediment <br />Total <br />Pond B <br />4.10 <br />0.31 (50% 0.62) <br />4.41 <br />Pond C <br />3.47 <br />0.41 (90% 0.46) <br />3.88 <br />Pond D <br />0.48 <br />0.07 (70% 0.10) <br />0.55 <br />Pond F <br />3.82 <br />0.07 (40% 0.18) <br />3.89 <br />Pond J <br />2.68 <br />0.36 (40% 0.91) <br />3.04 <br />Pond K <br />0.49 <br />0.18 (80% 0.22) <br />0.617 <br />Notes: <br />1. The capacity of Ponds B and C are shown on Maps 22 -B and 22 -C respectively. <br />2. The capacity of Pond D was certified by the undersigned on 12- 30 -97. <br />3. The capacity of Pond K was certified by the undersigned on May 29, 2002. <br />4. The capacity of Pond J was certified on Map 22 -J on August 13, 2008. <br />5. The capacity of Pond F was certified by Tammerin K. Stover - Bishop on <br />September 17, 2012. <br />To the best of my knowledge and belief, the impoundments have been maintained as <br />designed and in accordance with the approveotplan and, #a ' ble regulations. As <br />noted above, spring maintenance is require w,e iform o.fering and sediment <br />removal. <br />° ®��'• <br />James E. Stover �'O -® z--- gate <br />Colorado Professional Es <br />Registration No. 19230 +S1O1VA 0 <br />