My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-18_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2014-04-18_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:14 PM
Creation date
4/18/2014 10:20:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
4/18/2014
Doc Name
1st Quarter 2014 Wastebank Report
From
J.E. Stover & Associates
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pile #2 will not be used until later this Spring. One sheepsfoot compactor (Cat 855) was <br />compacting the Pile #2 area. We did not observe any surface failures in either compacted <br />or uncompacted gob. The air temperature was approximately 55 degrees F in sunny <br />conditions and evidence of drainage from snow melt was observed in several of the <br />drainage culverts and ditches that serve Pile No. 2. No snow was present on the slopes at <br />the time of our visit. No additional reclamation of any portions of Pile #2 had been <br />performed since our last visit on December 17, 2013. <br />Closing <br />On -going monitoring of inclinometers and piezometers at CWDA No. 2 provides an <br />indication of the general stability of the refuse and can be useful in estimating expected <br />performance of similarly configured refuse piles at Bowie. For these reasons, we <br />recommend continued monitoring of this instrumentation on a quarterly basis. We <br />understand that as of April 1, 2014 another CMT/Geotechnical engineering firm will be <br />ascuming the duties of testing, monitoring and observation at the Bowie Mine #2 site. <br />This report then represents the final required reporting by Buckhorn Geotech, Inc. on <br />your behalf in fulfillment of the requirements of Section 4.10.2 -Site Inspection, <br />Regulations of the Colorado Mined Land Reclamation Board for Coal Mining (Revised <br />9/14/2005) on behalf of Bowie Resources, LLC. <br />We sincerely appreciate the opportunity to have worked with you on this project for the <br />past nine years. If you have any questions regarding this letter or the instrumentation <br />monitoring at CWDA No. 2, please don't hesitate to contact me at (970) 497 -8852 or <br />dan(abbuckhorngeo.com. <br />Sincerely, �d;•�`�' Y -"' •;� <br />BUCKHORN GEOTECH, INC. <br />c <br />38334 <br />Daniel C. Quigley, P.E. '`Ff °'•4Oj1• °° <br />�'� NAL <br />Enclosures: Instrumentation Site Plan, Inclinometer Cumulative Displacements, Summary of <br />Pore Pressure Monitoring <br />cc: Jim Stover, J.E. Stover and Associates — ELECTRONICALLY ONLY <br />2014- 1st Quarter Monitoring Report PN #05- 126 -GEO <br />April 2, 2014 <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.