Laserfiche WebLink
P7 <br />110c Annual Report <br />RECEIVED <br />APR 17 201 ,fage 2 of3 <br />DIVISION OF IIECLAMATION <br />MININGAND SAFETY <br />Permittee Name: <br />White River Aggregates, <br />Inc. <br />Permit Number: <br />M- 1991 -009 <br />Operation Name: <br />White River S & G Pit <br />County: <br />Rio Blanco <br />Annual Fee Due: <br />$323.00 <br />Anniversary Date: <br />April 17, 2014 <br />Permit Acreage: <br />6.70 <br />Current Bond Amt: <br />$19,493.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. L, while completing this report, you learn that your site is not in compliance with the :saes and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). fAl NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? 14-1,26 o 7 <br />5. Does the mine operate more than 180 days per year? YES <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br />b) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />4•gf <br />` aww- <br />7? <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />w /topsoil <br />mulched w/ <br />' l <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons /ac): <br />'/;2 <br />apvd fertilizer: <br />W <br />depth (in.): <br />yl <br />7I <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />y <br />method: <br />-1i <br />