My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-04_GENERAL DOCUMENTS - C1981028 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2014-04-04_GENERAL DOCUMENTS - C1981028 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:51 PM
Creation date
4/16/2014 1:30:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
4/4/2014
Doc Name
Proposed Decision & Findings & Cost Estimate (SI1)
From
DRMS
To
Coors Energy Company
Permit Index Doc Type
Findings
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 36 of 39 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />_ <br />153.53 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />3 <br />min <br />1 <br />3400.00 <br />1.00 <br />3.00 <br />4.00 <br />2665 <br />1.439 <br />Haul Time: 1.439 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />_ <br />153.53 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />3 <br />min <br />1 <br />3400.00 <br />-1.00 <br />3.00 <br />2.00 <br />2905 <br />1.205 <br />minutes <br />minutes <br />352.77 LCY/Hour <br />127.43 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software <br />Return Time: 1.205 <br />Total Truck Cycle Time: 5.548 <br />Loading Tool unit <br />Production <br />425.03 <br />LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />_ <br />153.53 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 382.28 <br />Adjusted single truck/loader team production: 352.77 <br />Adjusted multiple truck/loader team production: 352.77 <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 1.38 <br />Unit cost: <br />$1.564 <br />/LCY Total job cost: $760.09 <br />minutes <br />minutes <br />352.77 LCY/Hour <br />127.43 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.