Laserfiche WebLink
Page 34 of 39 <br />TRUCK/LOADER TEAM WORK <br />Task description: Clean sediment from Pond 2, dispose in B -Pit <br />Site: Keenesburg Strip Mine Permit Action: MT6 <br />PROJECT IDENTIFICATION <br />Task #: I01 State: Colorado <br />Date: 3/26/2014 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team - Truck: Generic 12 -18 cy, 6x4 <br />- Loader: Cat 320D L 9' -6" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br />Permit/Job #: C1981028 <br />Abbreviation: None <br />Filename: CO28 -I01 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $551.73 <br />MATERIAL QUANTITIES <br />Initial volume: 486 CCY Swell factor: 1.000 <br />Loose volume: 486 LCY <br />Source of estimated volume: Coors Site Plan; assume 4" deep sediment <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />3,400 Pounds/LCY <br />Sand and gravel - Wet <br />50,300 Pounds <br />14.79 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$14.43 <br />$24.63 <br />NA <br />NA <br />$37.98 <br />$10.68 <br />Operating cost/hour: <br />$67.87 <br />$49.57 <br />NA <br />NA <br />$17.36 <br />$9.37 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$26.92 <br />$36.65 <br />NA <br />NA <br />$37.83 <br />$0.00 <br />Unit Subtotals: <br />$109.22 <br />$110.85 <br />NA <br />NA <br />$93.17 <br />$20.05 <br />Number of Units: <br />3 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: $438.51 <br />Support: $0.00 <br />Maint $113.22 <br />Total work team cost/hour: $551.73 <br />MATERIAL QUANTITIES <br />Initial volume: 486 CCY Swell factor: 1.000 <br />Loose volume: 486 LCY <br />Source of estimated volume: Coors Site Plan; assume 4" deep sediment <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />3,400 Pounds/LCY <br />Sand and gravel - Wet <br />50,300 Pounds <br />14.79 LCY <br />CIRCES Cost Estimating Software <br />