My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-04_GENERAL DOCUMENTS - C1981028 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2014-04-04_GENERAL DOCUMENTS - C1981028 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:51 PM
Creation date
4/16/2014 1:30:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
4/4/2014
Doc Name
Proposed Decision & Findings & Cost Estimate (SI1)
From
DRMS
To
Coors Energy Company
Permit Index Doc Type
Findings
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Topsoil <br />Site: Keenesburg Strip Mine <br />Page 23 of 39 <br />SCRAPER TEAM WORK <br />facilities area <br />Permit Action: RN6 <br />PROJECT IDENTIFICATION <br />Task #: E04 State: Colorado <br />Date: 3/26/2014 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Permit/Job #: C1981028 <br />Abbreviation: None <br />Filename: CO28 -E04 <br />COSTShift basis: 1 per day <br />iption <br />Cost Breakdown: Scraper Work Team Support EQUiDment Maintenance Eauinment <br />Total work team cost/hour: $1,173.59 <br />MATERIAL OUANTITIES <br />Initial volume: 4,630 CCY Swell factor: 1.060 <br />Loose volume: 4,908 LCY <br />Source of estimated volume: Permit commitment; 6 inches topsoil <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />25 <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$100.38 <br />NA <br />$69.88 <br />$78.33 <br />NA <br />NA <br />Operating cost/hour: <br />$242.98 <br />NA <br />$36.67 <br />$146.66 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$38.82 <br />NA <br />$38.85 <br />$38.85 <br />NA <br />NA <br />Unit Subtotals: <br />$382.18 <br />NA <br />$145.39 <br />$263.84 <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />1 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$764.36 <br />Support: <br />$409.23 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $1,173.59 <br />MATERIAL OUANTITIES <br />Initial volume: 4,630 CCY Swell factor: 1.060 <br />Loose volume: 4,908 LCY <br />Source of estimated volume: Permit commitment; 6 inches topsoil <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,850 lbs/LCY <br />Material description: <br />Sand - Damp <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />28.63 LCY <br />Scraper Bowl (volume) Basis <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />28.63 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.