My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-04_GENERAL DOCUMENTS - C1981028 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2014-04-04_GENERAL DOCUMENTS - C1981028 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:51 PM
Creation date
4/16/2014 1:30:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
4/4/2014
Doc Name
Proposed Decision & Findings & Cost Estimate (SI1)
From
DRMS
To
Coors Energy Company
Permit Index Doc Type
Findings
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 21 of 39 <br />BULLDOZER WORK <br />Task description: Push topsoil to powder magazine <br />Site: Keenesburg Strip Mine Permit Action: MT6 Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: E03 State <br />Date: 3/26/2014 County <br />User: JLE <br />Colorado <br />Weld <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: CO28 -E03 <br />HOURLY EQUIPMENT COST <br />Swell factor: 1.060 <br />Basic Machine: Cat D9T - 9SU <br />Loose volume: 392 LCY <br />Horsepower: 405 <br />Division of Reclamation, Mining & Safi <br />Source of estimated swell <br />Blade Type: Semi - Universal <br />factor: <br />Attachment: NA <br />Average push distance: <br />Shift Basis: 1 per day <br />Unadjusted hourly <br />1,872.0 LCY/hr <br />Data Source: (CRG) <br />Materials consistency description: <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$146.66 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.85 <br />NA <br />Total unit Cost/Hour: $255.39 <br />Total Fleet Cost/Hour: $255.39 <br />MATERIAL OUANTITIES <br />Initial Volume: 370 <br />Swell factor: 1.060 <br />Loose volume: 392 LCY <br />Source of estimated volume: <br />Division of Reclamation, Mining & Safi <br />Source of estimated swell <br />Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />60 feet <br />Unadjusted hourly <br />1,872.0 LCY/hr <br />production: <br />Materials consistency description: <br />Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 4,000 feet <br />Material weight: 2,850 lbs/LCY <br />Weight description: Sand - Damp <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.