My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-04_REVISION - C1981028 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2014-04-04_REVISION - C1981028 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:52 PM
Creation date
4/16/2014 12:50:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
4/4/2014
Doc Name
Proposed Decision & Findings & Cost Estimate
From
DRMS
To
Coors Energy Company
Type & Sequence
SI1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 39 <br />TRUCK/LOADER TEAM WORK <br />Task description: Pick up and haul asphalt from access road to B -Pit <br />Site: Keenesburg Strip Mine Permit Action: MT6 <br />PROJECT IDENTIFICATION <br />Task #: COI State: Colorado <br />Date: 3/26/2014 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />Permit/Job #: C1981028 <br />Abbreviation: None <br />Filename: CO28-COI <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />Equipment Description <br />Truck Loader Team - Truck: Generic 12 -18 cy, 6x4 <br />- Loader: CAT 966H <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $921.17 <br />MATERIAL QUANTITIES <br />Initial volume: 6,505 CCY Sivell factor: 1.400 <br />Loose volume: 9,107 LCY <br />Source of estimated volume: 4.2 mile x 24' w x .33' th. <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />asis: <br />2,800 Pounds/LCY <br />User Provided <br />50,300 Pounds <br />17.96 LCY <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />15 <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$14.43 <br />$34.06 <br />$69.88 <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$67.87 <br />$64.79 <br />$22.00 <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$26.92 <br />$36.27 <br />$38.85 <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$109.22 <br />$135.12 <br />$130.73 <br />NA <br />NA <br />NA <br />Number of Units: <br />6 <br />1 <br />1 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $790.44 <br />Support: $130.73 <br />Maint: $0.00 <br />Total work team cost/hour: $921.17 <br />MATERIAL QUANTITIES <br />Initial volume: 6,505 CCY Sivell factor: 1.400 <br />Loose volume: 9,107 LCY <br />Source of estimated volume: 4.2 mile x 24' w x .33' th. <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />asis: <br />2,800 Pounds/LCY <br />User Provided <br />50,300 Pounds <br />17.96 LCY <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.