Laserfiche WebLink
Other Reclamation Permits held by Prospective Successor (if applicable): <br />DESIGNATION OF REVIEW TIMELINE <br />As explained above, the Pernlittee and Prospective Successor may waive their right to receive a <br />decision on an Application within 30 days in order to alloy% the Division to calculate the required <br />Financial Warranty before issuing its decision. Pernlittee and Prospective Successor must initial <br />one of the follotivina two options to designate their choice. If Pernlittee and Prospective <br />Suc5pssa� c, of gree, the Division will render its decision within 30 clays. <br />1 AU V, I have reviewed the information provided in this Application <br />PeN tte Packet, as well as the applicable Act and Rules. (laving been full <br />!Z it,t 3 informed. I wish to WAIVE MY RIGHT TO A DECISION ON <br />Prospective Successor MY APPLICATION WITHIN 30 DAYS. <br />I have reviewed the information provided in this Application <br />Packet. as well as the applicable Act and Rules. Having been full} <br />informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br />ON MY APPLICATION WITHIN 30 DAYS. <br />The Prospective Successor must provide an adequate Financial Warranty or conelilionul <br />replacement Financial Warranty, consistent with the designation above. Hard Rock and <br />Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br />Each Financial Warranty must be submitted on the Board's approved forms (available online at <br />I) Itna�nllllln�_. St( 1te. Cn, US�MIIIeI 'ill��'n�nl'OI'lI1C.ht111). <br />RECEIVED <br />JAN 14 2014 <br />Division of Reclamation, <br />- 6 - Mining & Safety <br />