Mr. Tim Cazier <br />April 9, 2014 <br />Page 14 <br />As agreed upon by the Division and CC &V, CC &V will provide an update to the Exhibit <br />L reclamation cost data and additional "tabs" to address the reclamation costs <br />associated with Technical Revisions approved by the Division after the approval of <br />Amendment No. 10. CC &V agreed to provide the Division an update of Exhibit L as <br />part of CC &V's Annual Report of the Cresson Project on a biannual basis. The first <br />update will be included in the Annual Report that will be due on April 9, 2014 and <br />subsequent updates will be submitted to the Division every two years after that until <br />both CC &V and the Division agree it is no longer needed for the Cresson Project. <br />An update of the reclamation cost estimate for Cresson Project Amendment No. 10 was <br />completed in early 2014 and the revised Exhibit L is attached to this report. The 2014 <br />updated estimated liability amount is calculated to be $192,355,520. CC &V proposes to <br />post a total of $194,000,000 in reclamation warranty, allowing a surplus of $1,644,480 <br />at full build -out to be applied to future Technical Revisions. <br />This will increase the current posted warranty of $130,143,871.21 by an additional <br />$63,856,128.79. CC &V will post the additional $63,856,128.79 in three (3) separate <br />installments, as discussed and agreed upon by the Division. The first installment (of <br />which $31,000,000 has been posted previously) will be increased by $7,851,856.30 and <br />represents the 2014 cost increase for all components of the Cresson Project with the <br />exception of the Squaw Gulch Valley Leach Facility ( "SGVLF "), which has yet to be <br />completed. The second installment will be in approximately 2015 in the amount of <br />approximately $36,962,819.85 and will include the completed Phase 1 SGVLF. The <br />final installment will be posted in circa 2017 in the amount of approximately <br />$19,041,452.65 and will be for the completed Phase 2 SGVLF.This is the last <br />component to be completed for the Cresson Project under Amendment No. 10 to Permit <br />No. M- 1980 -244. With that final installment, the total posting of $194,000,000 for the <br />Cresson Project will be completed by CC &V. <br />The total amount currently posted for the Cresson Project is $130,143,871.21. Upon <br />acceptance by the Division of the 2014 updated reclamation cost estimate included as <br />revised Exhibit L (Appendix A of this report), CC &V will increase the warranty amount to <br />$137,995,727.51 ($130,143,871.21 current warranty plus $7,851,856.30 updated 2014 <br />cost except SGVLF). <br />Per 2CCR 407 -1, 407 -4, and Rules 1.15(1)(a), Financial Warranty /Letter of Credit No. <br /> from the Dresdner Bank AG, New York Branch, in the amount of <br />$33,331,600.00 replaced the St. Paul Fire and Marine Surety Bond No. for the <br />same amount. The new financial warranty was sent to DRMS on July 16, 2004 and the <br />St Paul Fire and Marine bond was released on July 21, 2004. <br />Liberty Mutual Surety Bond No. was increased to $38,922,271.21 effective <br />December 17, 2012. <br />