Squaw Gulch VLF Chemical Closure and Reclamation Costs
<br />Footnotes for summary cost table:
<br />'Assumes heavy grading will be done with conventional D70 or Dl 1 dozers wth U blades where the push distances are practical
<br />'Assumes light grading will be done with a D9 dozer on the backfilled areas in Wildhome Extension area (rate = 2 hrslaae)
<br />3Growlh Medium Replacement seat will consist of three 623 Scrapers
<br />4Growth Medium will be spread using a D-9 dozer to a depth of S inches
<br />'Soil analyses will be run on samples of the reclaimed areas to determine optimum fertilizer rates
<br />°Ripping and fertilizing will be conducted w the replaced growth medium using a conventional D4 dozer with a cyclone spreader
<br />'Seeding and harrowing will be conducted on all replaced growth medium that is traversible with conventional equipment
<br />eAssumes approximately has the area will require hand - seeding to achieve revegetation
<br />9Mulching will be conducted using conventional hydro-seedermyd- ulcher
<br />10Trees and shrubs will be planted on north and east -facing slopes
<br />"Supervisor costs are figured at 25 percent of the total work hours to accomplish the reclamation effort
<br />Fence removal cost = $ 2.98 Cost per Foot, Means 2014, p. 33
<br />24" Steel pipe removal cost = $ 21.90 Cost per Foot, Means 2014, P. 28
<br />30" Steel pipe removal cost = $ 29.20 Cost per Foot Means 2014 . 28
<br />Productivity Calculation for Heavy Gradin
<br />What Is the Total Volume of backfilled rock to be graded?
<br />21,650,246
<br />Reference Sheet 9 (Average of culMll amounts)
<br />777F Haul Truck Productivity
<br />What is Me average Haul Distance for all material?
<br />1736
<br />Feet per Drawing Sheet 9
<br />3.00
<br />What is the volume if It were all just 5 ft. grading ?
<br />2,807,200
<br />Calculated Volume - Area x 5 R 127
<br />What is the expected average push distance for leveling piles?
<br />100
<br />Short Doze to level out and - dumped truck loads
<br />What is the job correction factor for the operator?
<br />0.75
<br />Average Operator, Cat Hdbk, 33 Ed, p142
<br />What is the job correction factor for the material condition?
<br />1.2
<br />Waste rock is loose, Cat Hdbk, 33 Ed, p1 J2
<br />What is the job correction factor for job efficiency?
<br />0.83
<br />50 minutes operating per hour, Cat Hdbk, 33 Ed, p142
<br />What is the job correction factor for downhill grade pushing?
<br />1.2
<br />Assume conservatively 10% grade, Cat Hdbk, 33 Ed, pt-42
<br />What is the Lb correction factwfa aide beside dozing? - ________________
<br />1_2 _
<br />SidebYsidedozing,Ca!tdbk_33 Ed, p1J2_-_-_______ ______________________________n
<br />What is unadjusted production based on push distance for a DIG?
<br />1,760
<br />cu ydaerr from Regression Equation Developed from Cat Handbook Version 39
<br />(Calalated adjusted production based on job factors =
<br />1893.4
<br />cu ydalhr calculated
<br />Calaleted D70 Dozer hours in redin =
<br />1482.66 hours
<br />What is unadjusted production based on push distance for a D11?
<br />2,728
<br />cu ydsihr from Regression Equation Developed from Cat Handbook Version 39
<br />Calculated adjusted adjusted production based on job factors =
<br />2934.1
<br />ou ydsthr calculated
<br />�Cekulatetl D7l Dozer hours in 9!a1in3_- _ -_ -_-
<br />____956.76
<br />-hours __-_-___-___-_-_-_-_______- _- _- _- _- _________- _- _- ________
<br />_- _- ____- ____-
<br />Mass Haul Productivity
<br />for FIII Earthwork
<br />Exceeding 5 fL Heavy Dozer Leveling of Piles
<br />Additional Volume that will be truck hauled
<br />488.5
<br />18,843,046 Difference between Total Volume and the Volume for leveling 5 R pit»
<br />What is the weighted average Haul Distance for the truck haul?
<br />748.9
<br />1,723 Change In Moment arm by removing s R. push = (Vt- HDt.Vd•HDd)Nrsm
<br />What is loaded travel time based on haul distance 8 rolling resistance (min)?
<br />623 Scrapers
<br />1A
<br />What is empty travel time based on haul distance 5 rolling resistance (min)?
<br />Haul Dist
<br />0.6
<br />What is the manuever time for trucks at the loading area (min)?
<br />$
<br />0.70
<br />What is the length of time it is a truck to dump (min)?
<br />85,381
<br />1.00
<br />What is the capactiy of the selected truck (avg cu yds)?
<br />Calculated lime for loading a truck (min) _
<br />Total Cycle Time (Maneuver + Load + Loaded Haul + Empty Haul + Dump) _
<br />Calculated number of truckloads per hour =
<br />What is the efficiency of the haulage effort expressed as minutes per hour?
<br />Calculated Productivity of LoadeATmck Combination (cu ydsthour) _
<br />Total Fleet Hours Required
<br />What is the selected equipment to haul growth medium?
<br />How many scrapers will be used?
<br />What is the area for growth medium replacement?
<br />What Is the thickness of growth medium replacement?
<br />Calculated quantity of growth medium required =
<br />64
<br />777F Haul Truck Productivity
<br />3.00
<br />Source 2
<br />Source 3
<br />Source 4
<br />source 5
<br />Total Fleet Hours
<br />Haul Distance
<br />6.75
<br />2,102
<br />3,656
<br />0
<br />0
<br />Loaded Travel Time
<br />8.9
<br />1.8
<br />3.1
<br />0.0
<br />0.0
<br />Regression at 1307.7 feet per min - 6% 11
<br />Empty Travel Time
<br />55
<br />0.7
<br />1.3
<br />0.0
<br />0.0
<br />Regression at 2,724 feet per min -6 %grade
<br />Total Cycle Time
<br />521.2
<br />7.2
<br />9.1
<br />4.7
<br />4.7
<br />Truckloads per hour
<br />36164.3
<br />8.3
<br />6.6
<br />12.8
<br />12.8
<br />Productivity
<br />Scraper Productivity
<br />488.5
<br />388.6
<br />748.9
<br />748.9
<br />431.8
<br />Fleet Hours Required
<br />623 Scrapers
<br />Source
<br />Volume
<br />Haul Dist
<br />Prod
<br />Hours
<br />$
<br />3
<br />GM4
<br />85,381
<br />2,894
<br />153
<br />559
<br />v
<br />n
<br />348.0 acres
<br />GM27a
<br />95,339
<br />2,102
<br />195
<br />489
<br />yy rp,,
<br />0.5 feel
<br />GM34
<br />100,000
<br />3,656
<br />128
<br />783
<br />280,662 cu yds
<br />0
<br />0
<br />0
<br />0
<br />n
<br />Total/Average
<br />280,720
<br />2,897
<br />152.5956581
<br />1,831
<br />19- SquawVLF
<br />4/10/2014
<br />777F Haul Truck Productivity
<br />Source 1
<br />Source 2
<br />Source 3
<br />Source 4
<br />source 5
<br />Total Fleet Hours
<br />Haul Distance
<br />2,894
<br />2,102
<br />3,656
<br />0
<br />0
<br />Loaded Travel Time
<br />2.4
<br />1.8
<br />3.1
<br />0.0
<br />0.0
<br />Regression at 1307.7 feet per min - 6% 11
<br />Empty Travel Time
<br />1.0
<br />0.7
<br />1.3
<br />0.0
<br />0.0
<br />Regression at 2,724 feet per min -6 %grade
<br />Total Cycle Time
<br />8.1
<br />7.2
<br />9.1
<br />4.7
<br />4.7
<br />Truckloads per hour
<br />7.4
<br />8.3
<br />6.6
<br />12.8
<br />12.8
<br />Productivity
<br />431.9
<br />488.5
<br />388.6
<br />748.9
<br />748.9
<br />431.8
<br />Fleet Hours Required
<br />197.7
<br />195.2
<br />257.3
<br />0.0
<br />0.0
<br />650.2
<br />Productivity by Regression Equation
<br />309.4
<br />324.0
<br />296.3
<br />362.9
<br />362.9
<br />19- SquawVLF
<br />4/10/2014
<br />
|