Laserfiche WebLink
16- ArequaVLF <br />Arequa Gulch VLF - Chemical Closure and Reclamation Costs <br />2014 Reclamation (Earthwork) for AGVLF This section was revised by MDE (3 -7 -14) <br />Assumotlons <br />Fence removal cost = <br />$ 2.98 Cost per Foot, Means 2014, p. 33 <br />Remove fencing and pipelines <br />I <br />24" Steel pipe removal cost = <br />$ 29.20 Cost per Foot, Means 2014, p. 28 <br />I <br />Haul and grade leach materials to achieve final contours <br />30" Steel pipe removal cost = <br />$ 21.90 Cost per Foot, Means 2014, p. 28 <br />Replace gr. medium to a depth of 6 inches and revegetate <br />What is the area of AGVLF? <br />588.3 acres <br />Footprint in reclamation estimate extends out particularly to the north over op footprint <br />What is the length of the permeter fencing to be removed? <br />3,450 feet <br />increase from 2,500 in 2007 (ratio used = 501.5/363.5 = 1.38) <br />What is the length of the piping (30" dia) to be removed? <br />6,900 feet <br />increased from 5,000 in 2007 (ratio used = 501.5/363.5 = 1.38) <br />What is the length of the piping (24" dia) to be removed? <br />21,200 feet <br />increased from 15,700 in 2007 (ratio used = 501.5/363.5 = 1.36) <br />What is the volume of material to push with dozers to achieve final contours? <br />10,640,000 cy <br />(See Final Surface & Volumes Dwg., Balanced AGVLF2.pdf) [compare with 1.2 million in 2007] <br />What is the average length of push to achieve final grading? <br />620 feet <br />measured from cross - sections <br />What is the volume of material to haul for final contouring? <br />24,145,456 cy <br />(See Final Surface & Volumes Dwg., Balanced AGVLF2.pdf) [compare with 13.2 million in 20071 <br />What is the weighted average haul distance for hauling leach fill materials? <br />1,500 feet <br />867 meters from the drawings and calculations in the comprehensive analysis by MDE in 2006 & 2007 <br />What is the volume of growth medium required for covering the graded AGVLF? <br />474,464 cy <br />area x 806.5 cy /acre it for 6 inch thickness of growth medium <br />What is the weighted average haul distance for hauling growth medium? <br />5,000 feet <br />Growth medium stockpile location map <br />34,765,456 cy <br />Total Volume Graded and Hauled <br />AGVLF Truck Haulage of Leach Material for Re- contouring <br />What is the weighted average haul distance for truck fleet? <br />1,500 feet <br />867 meters from the drawings and calculations in the comprehensive analysis by MDE in 2006 & 2007 <br />What is the anticipated grade resistance for trucks? <br />3.0 % <br />Estimated by MDE <br />What is the rolling resistance for the trucks in percent? <br />3.0 % <br />Estimated by MDE <br />Calculated total resistance for the trucks in percent = <br />6.0 % <br />Calculated (grade + rolling) <br />What is loaded travel time based on haul distance & rolling resistance (min)? <br />1.6 <br />Cat 777D Truck <br />Cat Hdbk, 33 Ed, p9-31 <br />What is empty travel time based on haul distance & rolling resistance (min)? <br />0.9 <br />Cat 777D Truck <br />Cat Hdbk, 33 Ed, p9-31 <br />What is the manuever time for trucks at the loading area (min)? <br />0.70 <br />Cat 777D Truck <br />Cat Hdbk, 33 Ed, p9-9 <br />What is the length of time it takes a truck to dump (min)? <br />1.00 <br />Cat 777D Truck <br />Cat Hdbk, 33 Ed, p9-9 <br />What is the bucket capacity of the selected loader (cu yds)? <br />16 <br />Cat 9926 Loader <br />Cat Hdbk, 33 Ed, p12 -92 <br />What is the capaciiy of the selected truck (avg cu yds)? <br />64 <br />Cat 777D Truck <br />Cat Hdbk, 33 Ed, p94 <br />Calculated number of loader buckets to fill the selected truck = <br />4.0 <br />Calculated <br />How long does it take to fill the loader bucket and dump into the truck (min)? <br />0.75 <br />Experience of MDE <br />Calculated time for loading a truck (min) = <br />3.00 <br />Calculated <br />Total Cycle Time (Maneuver+ Load + Loaded Haul + Empty Haul + Dump) = <br />7.20 <br />Minutes, calculated <br />Calculated number of truckloads per hour = <br />8.3 <br />Calculated <br />What is the efficiency of the haulage effort expressed as minutes per hour? <br />55 <br />Experience of MDE <br />Calculated Productivity of Loader/Truck Combination (cu yds/hour) = <br />488.9 <br />(truck capacity x truckloads/hr x efficiency) <br />AGVLF Dozer Productivity in Recontourina <br />What is the weighted average push distance for the dozen <br />620 <br />Calculated from quantities and measured cross -section slopes <br />What is the job correction factor for the operator? <br />0.75 <br />Average Operator, Cat Hdbk, 33 Ed, p142 <br />What is the job correction factor for the material condition? <br />1.2 <br />Heap leach material is loose, Cat Hdbk, 33 Ed, p142 <br />What is the job correction factor for job efficiency? <br />0.83 <br />50 minutes operating per hour, Cat Hdbk, 33 Ed, p142 <br />What is the job correction factor for downhill grade pushing? <br />1.2 <br />Assume conservatively 10% grade, Cat Hdbk, 33 Ed, p142 <br />What is the job correction factor for side by side dozing? <br />1.2 <br />Side by side dozing, Cat Hdbk, 33 Ed, p142 <br />What is the dozer unit and blade type selected? <br />D11 U-Blade <br />MDE assumption <br />What is unadjusted production based on push distance? <br />640 <br />800 for D11 <br />cu yds/hr from Estimated Dozing Prod. Chart, Cat Hdbk, 33 Ed, pi-39 <br />Calculated adjusted production based on job factors = <br />581A <br />cu yds/hr calculated <br />3/21/2014 <br />