My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-14_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-04-14_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 8:00:05 AM
Creation date
4/15/2014 3:19:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/14/2014
Doc Name
Annual fee report & map
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Cresson - Wild Horse Mine Reclamation Costs MLE2 <br />Footnotes for summary cost table: <br />'Assumes heavy grading will be done with conventional Dl or DI 1dozers with U blades where the push distances are practical <br />2Assumes light grading will be done with a D9 dozer on the backfilled areas in Wildhorse Extension area (rate = 2 hm /acre) <br />3Growth Medium Replacement fleet will consist of three 623 Scrapers <br />4Growth Medium will be spread using a D-9 dozer to a depth of 6 inches <br />sSoil analyses will be run on samples of the reclaimed areas to determine optimum fertilizer rates <br />'Ripping and fertilizing will be conducted on the replaced growth medium using a conventional D4 dozer with a cyclone spreader <br />'Seeding and harrowing will be conducted on all replaced growth medium that Is traversible with conventional equipment <br />9Mulching will be conducted using conventional hydro-seeder/hydro- mulcher <br />1OTrees and shrubs will be planted on north and east - facing slopes <br />"Supervisor costs are figured at 25 percent of the total work hours to accomplish the reclamation effort <br />Dozer Productivity Calculation for Heavy Gradina <br />is the Total Volume of backfilled rock to be graded? <br />2,663,740 <br />Reference Sheet 9 (Average of cu0fill amounts) <br />What is the weighted average Haul Distance for the truck haul? <br />(What <br />What is the average Haul Distance for all material? <br />785 <br />Feet per Drawing Sheet 9 <br />What is loaded travel time based on haul distance & rolling resistance (min)? <br />What is the volume If it were all just 5 ft. grading 7 <br />1,397,147 <br />Calculated Volume a Area x 5 ft 127 <br />What is the expected average push distance for leveling piles? <br />100 <br />Short Doze to level out end-dumped truck loads <br />What is the job correction factor for the operator? <br />0.75 <br />Average Operator, Cat Hdbk, 33 Ed, pl42 <br />What is the job correction factor for the material condition? <br />12 <br />Waste rock is loose, Cat Hdbk, 33 Ed, p142 <br />What is the job correction factor for job efficiency? <br />0.83 <br />50 rninutes operating per hour, Cat Hdbk, 33 Ed, p142 <br />What is the job correction factor for downhill grade pushing? <br />1.2 <br />Assume conservatively 10% grade, Cat Hdbk, 33 Ed, p142 <br />What is the job correction factor for side by side dozing? <br />1,2 <br />Cat Hdbk, 33 Ed, pl42 <br />bysida dozing------------------------------------------ <br />_ ___- <br />What is unadjusted production based on push distance for a D10? <br />_- _ -_ -__ <br />1,760 <br />_Side <br />cu ydsMr from Regression Equation Developed from Cat Handbook Version 39 <br />Calculated adjusted production based on job factors = <br />1893.4 <br />cu yds/hr calculated i <br />Calculated Dl 0 Dozer hours in grading = <br />737.92 <br />4.7 <br />_ _ _____________737.92____hours_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __________ <br />rWhat is unadjusted production based on push distance for a D11? 2,728 cu ydsthr from Regression Equation Developed from Cat Handbook Version 39 <br />Calculated adjusted production based on job factors = <br />2934.1 <br />cu yds/hr calculated <br />'`alculeted DlO Dozer hours in grading__ -_ _ _ _ _ <br />_ _ _ _ _476.16_ <br />_ hours_ _ _ _ _ _ _- _ -_ -_ -_ _ ___- _- _- _- _- _____ -_ -� <br />Mass Haul Productivity <br />for Fill Earthwork Exceeding <br />5 ft. Heaw Dozer Leveling of Piles <br />Additional Volume that will be truck hauled <br />1,266,593 <br />Difference between Total Volume and the Volume for leveling 5 ft piles <br />What is the weighted average Haul Distance for the truck haul? <br />733 <br />Total Fleet <br />What is loaded travel time based on haul distance & rolling resistance (min)? <br />0.6 <br />Source 2 <br />Source 3 <br />What is empty travel time based on haul distance & rolling resistance (min)? <br />0.3 <br />Hours <br />Distance <br />What is the manuever time for trucks at the loading area (min)? <br />0.70 <br />What is the length of time it takes a truck to dump (min)? <br />1.00 <br />led Travel Time <br />4.3 <br />What is the capacty of the selected truck (avg cu yds)? <br />64 <br />0.0 <br />0.0 <br />Calculated time for loading a truck (min) = <br />3.00 <br />2.1 <br />0.0 <br />Total Cycle Time (Maneuver + Load + Loaded Haul + Empty Haul + Dump) = <br />5.57 <br />0.0 <br />egression at 2,724 feet per min -6% grade <br />Calculated number of truckloads per hour = <br />10.8 <br />4.7 <br />4.7 <br />What is the efficiency of the haulage effort expressed as minutes per hour? <br />55 <br />:loads per hour <br />Calculated Productivity of Loader/Truck Combination (cu yds/hour) = <br />631.6 <br />12.8 <br />12.8 <br />Total Fleet Hours Required <br />2005.4 <br />Ictivity <br />316.6 <br />748.9 <br />Scraper Productivity <br />746.9 <br />748.9 <br />What is the selected equipment to haul growth medium? <br />623 Scrapers <br />Source Volume Haul Dist Prod Hours ^g <br />How many scrapers will be used? <br />3 <br />GM4 139,715 5,670 91.3092 <br />1530 <br />What is the area for growth medium replacement? <br />173.2 acres <br />0 <br />0 0 0 <br />What is the thickness of growth medium replacement? <br />0.5 feet <br />0 <br />0 ag` <br />Calculated quantity of growth medium required = <br />139,686 cu yds <br />0 <br />0 <br />0 <br />0 <br />TotaVAverage 139,715 5,670 91.3092 <br />1,530 <br />12 -East Cresson -Wild Horse <br />3/21/2014 <br />Total Fleet <br />Source 1 <br />Source 2 <br />Source 3 <br />Source 4 <br />Source 5 <br />Hours <br />Distance <br />5,670 <br />0 <br />led Travel Time <br />4.3 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />egression at 1307.7 feet per min - 6% grade <br />ty Travel Time <br />2.1 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />egression at 2,724 feet per min -6% grade <br />Cycle Time <br />11.1 <br />4.7 <br />4.7 <br />4.7 <br />4.7 <br />:loads per hour <br />5.4 <br />12.8 <br />12.8 <br />12.8 <br />12.8 <br />Ictivity <br />316.6 <br />748.9 <br />748.9 <br />746.9 <br />748.9 <br />316.6 <br />Hours Required <br />441.2 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />441.2 <br />activity by Regression Equation <br />258.0 <br />362.9 <br />362.9 <br />362.9 <br />362.9 <br />12 -East Cresson -Wild Horse <br />3/21/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.