My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-14_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-04-14_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 8:00:05 AM
Creation date
4/15/2014 3:19:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/14/2014
Doc Name
Annual fee report & map
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION COST ESTIMATE <br />Building or Structure <br />No. <br />Length <br />Width <br />Height <br />Cu.Ft. <br />$ /Cu.Ft. <br />Cost <br />Cresson Plant <br />Primary Crushers <br />Crane above pocket <br />1 <br />1 <br />78.0 <br />85.0 <br />48.0 <br />33.0 <br />112.0 <br />50.0 <br />419,328 <br />140,250 <br />$ 0.36 <br />$ 0.36 <br />$ 150,958 <br />$ 50,490 <br />Secondary Crusher MCC <br />1 <br />53.0 <br />21.0 <br />15.0 <br />16,695 <br />$ 0.36 <br />$ 6,010 <br />Secondary Crushers <br />1 <br />120.0 <br />67.0 <br />107.0 <br />860,280 <br />$ 0.36 <br />$ 309,701 <br />Screen Bldg <br />1 <br />72.0 <br />32.0 <br />86.0 <br />198,144 <br />$ 0.36 <br />$ 71,332 <br />Screen MCC's <br />1 <br />40.0 <br />18.0 <br />15.0 <br />10,800 <br />$ 0.36 <br />$ 3,888 <br />Loadout Bin <br />1 <br />21.85 <br />36.0 <br />13,492 <br />$ 0.36 <br />$ 4,857 <br />Lime Silo <br />1 <br />84.0 <br />21.5 <br />119,088 <br />$ 0.36 <br />$ 42,872 <br />Conveyor <br />Length <br />$ /Lin Ft' <br />Screen Feed <br />1 <br />587.0 <br />$ 25.32 <br />$ 14,863 <br />Crushed Ore <br />1 <br />1,243.0 <br />$ 25.32 <br />$ 31,473 <br />Second Crusher Feeder <br />1 <br />843.0 <br />$ 25.32 <br />$ 21,345 <br />Shuttle <br />2 <br />111.0 <br />$ 25.32 <br />$ 5,621 <br />Screen Undersize <br />1 <br />620.0 <br />$ 25.32 <br />$ 15,698 <br />Screen Oversize <br />1 <br />555.0 <br />$ 25.32 <br />$ 14,053 <br />Product to LOB load -out bin <br />1 <br />586.0 <br />$ 25.32 <br />$ 14,838 <br />LOB Relocation Phase IV 2008 <br />1 <br />2,050.0 <br />$ 25.32 <br />$ 51,906 <br />Cresson Plant <br />SUBTOTAL <br />809,903 <br />Crusher Maint. Bldg. <br />1 <br />40.0 <br />40.0 <br />17.0 <br />27,200 <br />$ 0.38 <br />$ 10,336 <br />Security Bldg <br />1 <br />65.0 <br />40.0 <br />10.0 <br />26,000 <br />$ 0.36 <br />$ 9,360 <br />MCC Building for Phase II Pumps <br />Laboratory <br />1 <br />21.0 <br />11.0 <br />12.0 <br />21772 <br />$ 0.36 <br />SUBTOTAL <br />$ 998 <br />20,694 <br />Laboratory Building <br />Water Tanks <br />1 <br />No. <br />150.0 <br />68.7 <br />Diameter <br />52.4 <br />Height <br />539,982 <br />Cu.Ft. <br />$ 0.38 <br />$ /Cu.Ft.' <br />205,193 <br />Cost <br />Water Tanks <br />Water Tanks - Fire Water <br />2 <br />1 <br />25.0 <br />16.0 <br />28.0 <br />26.6 <br />27,475 <br />5,346 <br />$ 0.36 <br />$ 0.36 <br />$ 9,891 <br />$ 1,924 <br />SUBTOTAL <br />11,815 <br />2014 Means Heavy Construction Cost Data - This footnote applies to all sheets within this TAB <br />Prorated cost for conveyor demolition based on historic costs and Means. <br />This table has been revised by MDE <br />11- Demolition <br />3/21/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.