Laserfiche WebLink
9 -Matt and Services Costs <br />2014 Costs for Selected Materials and Services to Accomplish Reclamation and Closure for CC& Rev. 3 -4 -14 by MDE <br />Inflation Current <br />Material Item or Service Old Cost Units Factor Cost 2014$) Rate Used Units <br />2014 <br />Total Cost <br />per Unit <br />Comment or Source <br />Fertilizer 18 -46 -0 <br />$ 0.443 <br />400 <br />Ibs /acre <br />$ 177.20 <br />Arkansas Valley Seed Co. 2014 <br />Seed Mix <br />$ 2.278 <br />25.02 <br />Ibs /acre <br />$ 57.01 <br />Ark.Valle Seed inflated to 2014$ <br />Shrubs and Trees <br />Golder Associates <br />Letter from Mandel <br />8/1/2011 inflated to 2014$ by CPI <br />Ratio <br />Gooseberry Currant <br />$ 6.534 <br />50 <br />per acre <br />$ 326.72 <br />Rosa Woodsii wild rose <br />$ 4.039 <br />50 <br />per acre <br />$ 201.95 <br />En lemann Spruce <br />$ 5.727 <br />25 <br />per acre <br />$ 143.18 <br />Bristlecone Pine <br />$ 9.093 <br />25 <br />per acre <br />$ 227.32 <br />Total Cost of Shrub & Tree Planting / Ac = <br />$ 899.17 <br />H dromulch Wood Fiber <br />$ 520.00 <br />1.0 <br />ton /acre <br />$ 520.00 <br />Avg of 2 Quotes Ark Valle + Hanes <br />Water for H dromulchin & Rinsing <br />$ 0.00247 <br />2400 <br />al /acre <br />$ 5.93 <br />Current CC &V water costs '14 <br />Fencing and Installation <br />[6 ft high industrial 6 gage steel chain link] <br />$ 26.78 <br />per foot <br />$ 28.12 <br />$ 28.12 <br />2014 Means Heavy Cons Costs, p. 316 <br />Plugging Drill Holes <br />Quikrete or Sakrete 60 lb bas <br />$ 2.99 <br />per bag <br />$ 4.38 <br />350 <br />bas <br />$ 1,533.00 <br />Avg. of 4 Websites' Published Costs <br />Sand <br />$ 26.87 <br />per c <br />$ 27.83 <br />1 <br />c /hole <br />$ 27.83 <br />Inflated to 2014$ by CPI Ratio <br />Bentonite Chips Cetco Product <br />$ 0.31 <br />perlb <br />$ 0.321 <br />14 <br />Ibs /ft <br />Cetco Granular, 2011$ inflated to 2014$ <br />Soil Sample Lab Services <br />$ 21.86 <br />[/sample <br />$ 22.63 <br />$ 22.63 <br />The costs at [eft are based on CC &V <br />experience with the tasks on a daily <br />operational basis. 2011 Warranty <br />numbers were inflated to 2014$ by the <br />CPI Ratio. <br />Heap Leach Effluent Sampling <br />$ 182.22 <br />/sam ple <br />$ 188.72 <br />$ 188.72 <br />Ground Water Samples <br />$ 425.17 <br />/sam ple <br />$ 440.32 <br />$ 440.32 <br />Surface Water Samples <br />$ 425.17 <br />/sample <br />$ 440.32 <br />$ 440.32 <br />Heap Leach Monitoring <br />$ 18,221 <br />/year <br />1 <br />$ 18,871 <br />$ 18,871 <br />Professional Travel <br />$ 91.11 <br />/day <br />$ 94.35 <br />$ 94.35 <br />Professional Travel Room & Board <br />$ 129.98 <br />/day <br />$ 134.61 <br />$ 134.61 <br />Water Sample Supplies <br />$ 121.47 <br />/trip <br />$ 125.80 <br />$ 125.80 <br />Tire Disposal <br />$ 315.84 <br />/trip <br />$ 327.10 <br />$ 327.10 <br />9 -Matt and Services Costs <br />