Laserfiche WebLink
By <br />Description of Modification <br />4- Changes <br />FINAL Version of the MLE2 Model prepared by Steffens and Associates, Inc. for the permit <br />SIDS application. Includes all , additions and modifications that have been made up to the date of <br />submittal and reflecting the results of reviews by CC &V (Jan 28, 2012) <br />Per Tim Cazier of DRMS there was a discrepancy in the summary sheet. When investigating, MDE <br />MDE /SDS found several places where cu yds were inadvertently added to the Labor Costs on individual <br />spreadsheets + there was a bad link to a subtotal rather than a total in the Arequa VLF worksheet. <br />All these changes were made and a revised summary sheet was prepared. (12 -5 -12) <br />MDE March 3, 2014. Added a tab at the end "2014 Costs" which captures most of the unit costs that will <br />be linked to the individual spreadsheets. <br />MDE March 4, 2014. Created 5 new tables in the "2014 Costs" tab and populated the tables with current <br />2014 costs. Linked this tab to the 8 -Labor Costs tab and the 9 -Matt and Services Tab. <br />MDE March 4, 2014. Updated Tab 23 -Wells with new costs for 80 hp backhoe based on Means 2014 <br />handbook. <br />MDE March 4, 2014. Linked "2014 Costs" Tab to the 11- Demolition Tab <br />MDE March 6, 2014. Linked "2014 Costs" (Eq Rental $) Tab to 10 -Egmt Costs Tab <br />MDE March 7, 2014. Linked "2014 Costs" Tab (operating $) to 10 -Egmt Costs Tab <br />MDE March 7, 2014. Revised 18 -AGLF Chemical Closure Costs by inflation factor <br />MDE March 7, 2014. Revised 18 -AGLF Reclamation Costs - pipe and fence removal costs per Means <br />2014, equipment & labor cost increases, and inflation. <br />MDE March 7, 2014. Revised 17 -SGVLF Chemical Closure Costs by inflation factor <br />March 7, 2014. Revised 17 -SGVLF Reclamation Costs - pipe and fence removal costs per Means <br />MDE 2014, equipment & labor cost increases, and inflation. Also found 4 links missing and re- established <br />these to the labor and equipment cost sheets. <br />MDE March 10, 2014. For comparison, added Means 2014 Oper. $ in 10 -Egmt Costs <br />MDE March 10, 2014. 13 -WHEX Grassy Valley updated Stream Restoration Unit $ <br />MDE March 10, 2014. Tab 22- Basin, updated inflation factor and applied to costs <br />MDE March 10, 2014. Tab 26- Powerlines Costs updated based on real -life numbers and compared to <br />Means 2014 unit costs for reasonableness. <br />MDE March 11, 2014. Updated Tabs 26, 27, 28, 29, 30, 31, 32, & 34 to verify links to appropriate cost <br />sheets and Tab 40 -CPI sheet and 2014 Costs Tab. <br />MDE March 11, 2014. Added PSE Building and Appurtenances Demo Costs Tab 11 <br />MDE March 11, 2014. Revised Links and Summations for Demo Costs Tab 11 to reflect all demolition <br />costs for the MLE2 Projects. <br />MDE March 11, 2014. Corrected minor error in formulas for hauling growth media in Tabs 17 & 18 <br />(Squaw and Arequa VLFs) <br />MDE March 11, 2014. Added a tab at the end (TRs) listing all Technical Revisions that have been <br />approved since Amendment No. 10 was approved. <br />MDE March 11, 2014. Added Costs of Technical Revisions to Tab 6- Summary <br />MDE March 21, 2014. Adjusted formatting to facilitate printing. <br />