Laserfiche WebLink
TABLE OF CONTENTS 2 -TOC <br />CRIPPLE CREEK & VICTOR (CCBV) GOLD MINING COMPANY MINE LIFE EXTENSION <br />2014 Revised RECLAMATION COST ESTIMATE <br />Sheet I)PCCrintinn of Cnntents Tab Name <br />3 <br />Legend for Spreadsheet Cell Colors and Calculation Links in the Revised 2014 Model <br />3-Legend <br />4 <br />List of Changes to this Revised March 2014 Model <br />4- Changes <br />5 <br />List of Assumptions and Procedures for this Revised March 2014 Model <br />5- Assumptions <br />6 <br />Summary Cost Table for Current Estimate <br />6- Summary CurrentUpdate <br />8 <br />12014 CC &V Reclamation Labor Rates <br />8 -Labor Costs <br />9 <br />12014 CC &V Materials and Services Costs <br />Matl and Services Costs <br />10 <br />2014 CC &V Reclamation Equipment Rates <br />Eqmt Costs <br />11 <br />2014 Demolition Costs <br />Demolition <br />12 <br />East Cresson - WildHorse (Excludes WHEX) Mine Reclamation Costs <br />East Cresson <br />13 <br />Wild Horse Extension and Grassy Valley Reclamation <br />WHEX Grassy Valley <br />14 <br />North Cresson Mine Reclamation Costs <br />N Cresson <br />15 <br />Main Cresson Mine Reclamation Costs <br />Main Cresson <br />16 <br />East Cresson Overburden Storage Area Reclamation Costs <br />E Cres OSA <br />17 <br />Squaw Gulch Overburden Storage Area Reclamation Costs <br />Squaw OSA <br />18 <br />Arequa Gulch ( AGVLF) Chemical Closure and Reclamation Costs <br />AGVLF <br />19 <br />Squaw Gulch ( SGVLF) Chemical Closure and Reclamation Costs <br />SGVLF <br />20 <br />#3 &4 Pads and Ajax Exploration Reclamation Costs <br />#3 &4 -Ajax <br />21 <br />Ironclad Facility and Access Corridor Reclamation <br />IronCladAccess <br />22 <br />JVLF Ponds, Sediment Ponds, & Storm Water Control Basins Reclamation Costs <br />Basins <br />23 <br />1 Monitoring Well and Piezometer Closure Costs <br />Wells <br />24 <br />IGrowth Medium Stockpiles Reclamation Costs <br />GM Piles <br />25 <br />lRoad Reclamation Costs <br />Roads <br />26 <br />jPowerline Removal Costs <br />Powerlines <br />27 <br />Reclamation of Building Footprint Areas <br />Bldg Footprints <br />28 <br />Mine Area Fencing Costs <br />Mine Area Fence <br />29 <br />Clean -up and Miscellaneous Costs Associated with Closure <br />Clean -up <br />30 <br />Revegetation Repairs and Maintenance <br />Reveg <br />31 <br />Ancillary Areas Reclamation <br />Ancillary <br />32 <br />Viewshed Conservation <br />Viewshed <br />33 <br />Mobilization and Demobilization Costs <br />Mob & Demob <br />34 <br />Post - Closure Monitoring of Heap Effluent, Gr. Water, Surf. Water, & Vegetation <br />Monitoring <br />